DESIGN OF PRESTRESSED BOX GIRDER BRIDGE WITH FULL SHORING CAST-IN-SITU COSTRUCTION METHOD
This thesis is based on the need of bridge constructions as supporting infrastructure of transportation system, specifically fly overs as one of vastly constructed bridges in big cities and developing areas. Fly overs usually have quite long main span which varies from 50 to 100 metres in length....
Saved in:
Main Author: | Rahmadiani, Syavira |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/44970 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STRUCTURAL PLANNING OF PRESTRESSED BRIDGE WITH SEGMENTAL BOX GIRDER CONCRETE AND BALANCED CANTILEVER CAST IN-SITU METHOD
by: Ilham Ramadhan, Akhmad -
DESIGN AND TOWING ANALYSIS OF FLOATING SHORE-PULL INSTALLATION PROCESS OF SUBSEA PIPELINE IN MADURA STRAIT
by: Raynaldi, Akhmad -
OPTIMASI BERAT STRUKTUR PANEL WING BOX
by: Djuhaedi -
GEOPHYSICAL ANALYSIS TO IDENTIFY FRESHWATER AND SALTWATER ZONES IN THE PLAN FOR THE CONSTRUCTION OF A NEW OPERATIONAL WELL BY PT X ON THE COASTAL SHORE OF SEUMADU ISLAND, LHOKSUMAWE, ACEH
by: Anggita Sari, Arash -
MANUFACTURE OF LATHE CASTING COMPONENT (TAILSTOCK) USING PARAMETRIC DESIGN
by: Hasanah Mihdar, Uswatul