DESIGN AND TOWING ANALYSIS OF FLOATING SHORE-PULL INSTALLATION PROCESS OF SUBSEA PIPELINE IN MADURA STRAIT
This study aims to discuss the analysis of subsea pipeline design planning and towing analysis of 2000meters long pipe deployment which will be used for the operation of natural gas distribution. The design planning process carried out includes planning the pipe wall thickness, concrete coating t...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/66390 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |