DESIGN AND TOWING ANALYSIS OF FLOATING SHORE-PULL INSTALLATION PROCESS OF SUBSEA PIPELINE IN MADURA STRAIT

This study aims to discuss the analysis of subsea pipeline design planning and towing analysis of 2000meters long pipe deployment which will be used for the operation of natural gas distribution. The design planning process carried out includes planning the pipe wall thickness, concrete coating t...

Full description

Saved in:
Bibliographic Details
Main Author: Raynaldi, Akhmad
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/66390
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia