DESIGN AND TOWING ANALYSIS OF FLOATING SHORE-PULL INSTALLATION PROCESS OF SUBSEA PIPELINE IN MADURA STRAIT
This study aims to discuss the analysis of subsea pipeline design planning and towing analysis of 2000meters long pipe deployment which will be used for the operation of natural gas distribution. The design planning process carried out includes planning the pipe wall thickness, concrete coating t...
Saved in:
Main Author: | Raynaldi, Akhmad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/66390 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SUBSEA PIPELINE DESIGN AND THERMAL EXPANSION ANALYSIS AT MADURA STRAIT
by: Vergus Sullivan, Bryan -
DESIGN AND CROSSING SUBSEA PIPELINES ANALYSIS AT MADURA STRAIT USING CONCRETE SLEEPER AS SUPPORT
by: Gunawan, Jeremy -
DESIGN AND RISK ASSESSMENT OF SUBSEA PIPELINE AT MADURA STRAIT USING STANDARD DNVGL RP-F107
by: Alvin Tanujaya, Vincent -
RISK ASSESSMENT OF SUBSEA PIPELINE BY IMPACTS OF DROPPED ANCHOR, DRAGGED ANCHOR, AND VESSEL SINKING IN MADURA STRAIT
by: Atthariq Yunisa, Amadea -
DESIGN OF SUBSEA PIPELINE FOR THE NUSANTARA PROJECT IN JAVA SEA
by: Anka, Logidea