permanent of formwork system. According to the concept of green construction, the conservation of the use of wood materials in construction is very important. On the other hand, wood materials are considered more inexpensive and relatively easy to be found, which makes the wooden formwork systems...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/45624 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | permanent of formwork system. According to the concept of green construction,
the conservation of the use of wood materials in construction is very important.
On the other hand, wood materials are considered more inexpensive and
relatively easy to be found, which makes the wooden formwork systems as the
most popular method that is used at present. As the wooden formwork becomes
almost the only material used for formwork system, the process of applying the
formwork system also becomes important thing that must be considered and
developed. The wood materials must be used as efficiently as possible to prevent
the waste of wooden formwork usage to be happened. In order to develop the
wooden formwork system, it is necessary to identify what factors resulted in the
wastage of wooden formwork.
Root cause analysis method is applied by making the fishbone diagram in order
tofind the wate factors. The objective of using the fishbone diagram is to identify
everything that may causes the waste of wooden formwork to get the root cause of
it. The case study that consist of field observation and interview in two different
building construction projects are conducted in order to make the fishbone
diagram. In addition, the results of interviews and observations is also compared
with the results of the literature review as the best practice that should be applied
in the field. Through data processing literature reviews, interviews, and field
observations, it was found that there are six aspects of the causes of waste
formwork, which are the design of the building, formwork system planning,
human resources, basic materials, equipment, and construction management
system. |
---|