BUSINESS PROCESS IMPROVEMENT THROUGH LEAN 4.0 CASE STUDY: INTI MAKMUR PLYWOOD DISTRIBUTOR

Nowadays, business process of every company, specifically distributor company, were done using conventional methods with lots of non-value-added activities or waste process which result in high total cycle time. In order to increase the efficiency of this process by reducing total cycle time, techno...

Full description

Saved in:
Bibliographic Details
Main Author: Triani Herlina Dewi, Nyoman
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/45729
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia