The Determination of Maintenance Task and Interval on Coal Handling System Based on Reliability-Centered Maintenance Method in PT. Arutmin Indonesia

Coal is the main energy source and a significant contributor to Indonesia’s state revenue. One of the largest coal companies in Indonesia is PT. Arutmin Indonesia. Kintap Mine is owned by this company. In operational activities at the Kintap Mine, the company is required to distribute 50 mm coal...

Full description

Saved in:
Bibliographic Details
Main Author: Maruli Hutabarat, Arthur
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/45776
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:45776
spelling id-itb.:457762020-01-24T09:45:41ZThe Determination of Maintenance Task and Interval on Coal Handling System Based on Reliability-Centered Maintenance Method in PT. Arutmin Indonesia Maruli Hutabarat, Arthur Indonesia Final Project Coal, maintenance, reliability-centered maintenance INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/45776 Coal is the main energy source and a significant contributor to Indonesia’s state revenue. One of the largest coal companies in Indonesia is PT. Arutmin Indonesia. Kintap Mine is owned by this company. In operational activities at the Kintap Mine, the company is required to distribute 50 mm coal from the mine to the barges according to the type agreed before. In order to increase company productivity, the determination of tasks and maintenance intervals on coal handling system from the mine to the barges is carried out based on the reliability-centered maintenance (RCM) method. It is done to achieve improvements on: cost efficiency and maintenance effectiveness, system availability and reliability, safety and environmental factors, and a comprehensive maintenance database. RCM is a method used to determine what must be done so that a physical asset can continue doing what is desired by its users in accordance with the context and target of its operations. The analysis on the RCM method consists of 7 questions that must be answered for each asset reviewed. Resource persons from PT. Arutmin Indonesia was involved in the analysis using the RCM method. All analysis results is recorded on the RCM decision worksheet. Maintenance tasks and intervals of 17 equipments which consists of 140 components of coal handling system at PT. Arutmin Indonesia Kintap Mine has been determined and recorded on the RCM decision worksheet. The total amount of maintenance tasks and intervals is 365 which consists of: 307 on-condition task, 39 redesign, 18 no scheduled maintenance, and 1 failure-finding task. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Coal is the main energy source and a significant contributor to Indonesia’s state revenue. One of the largest coal companies in Indonesia is PT. Arutmin Indonesia. Kintap Mine is owned by this company. In operational activities at the Kintap Mine, the company is required to distribute 50 mm coal from the mine to the barges according to the type agreed before. In order to increase company productivity, the determination of tasks and maintenance intervals on coal handling system from the mine to the barges is carried out based on the reliability-centered maintenance (RCM) method. It is done to achieve improvements on: cost efficiency and maintenance effectiveness, system availability and reliability, safety and environmental factors, and a comprehensive maintenance database. RCM is a method used to determine what must be done so that a physical asset can continue doing what is desired by its users in accordance with the context and target of its operations. The analysis on the RCM method consists of 7 questions that must be answered for each asset reviewed. Resource persons from PT. Arutmin Indonesia was involved in the analysis using the RCM method. All analysis results is recorded on the RCM decision worksheet. Maintenance tasks and intervals of 17 equipments which consists of 140 components of coal handling system at PT. Arutmin Indonesia Kintap Mine has been determined and recorded on the RCM decision worksheet. The total amount of maintenance tasks and intervals is 365 which consists of: 307 on-condition task, 39 redesign, 18 no scheduled maintenance, and 1 failure-finding task.
format Final Project
author Maruli Hutabarat, Arthur
spellingShingle Maruli Hutabarat, Arthur
The Determination of Maintenance Task and Interval on Coal Handling System Based on Reliability-Centered Maintenance Method in PT. Arutmin Indonesia
author_facet Maruli Hutabarat, Arthur
author_sort Maruli Hutabarat, Arthur
title The Determination of Maintenance Task and Interval on Coal Handling System Based on Reliability-Centered Maintenance Method in PT. Arutmin Indonesia
title_short The Determination of Maintenance Task and Interval on Coal Handling System Based on Reliability-Centered Maintenance Method in PT. Arutmin Indonesia
title_full The Determination of Maintenance Task and Interval on Coal Handling System Based on Reliability-Centered Maintenance Method in PT. Arutmin Indonesia
title_fullStr The Determination of Maintenance Task and Interval on Coal Handling System Based on Reliability-Centered Maintenance Method in PT. Arutmin Indonesia
title_full_unstemmed The Determination of Maintenance Task and Interval on Coal Handling System Based on Reliability-Centered Maintenance Method in PT. Arutmin Indonesia
title_sort determination of maintenance task and interval on coal handling system based on reliability-centered maintenance method in pt. arutmin indonesia
url https://digilib.itb.ac.id/gdl/view/45776
_version_ 1822927202264547328