COMPARATIVE ANALYSIS OF WEIGHING RAW MATERIAL SCHEDULING EFFECTIVITY IN LOGISTIC DEPARTMENT PT Y FARMA TOWARD THE COMPLETION TIME AND IDLE TIME
Production scheduling for 1 step process has many references to schedule more effectively and efficiently such as EDD (Early Due Date), SPT (Shortest Processing Time), LPT (Longest Processing Time) and FCFS (First Come First Serve). The problem that often arise in the production process, one of t...
Saved in:
Main Author: | Muhammad Fauzi, Andy |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/45814 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PRODUCTION SCHEDULING SIMULATION FOR DECREASING COMPLETION TIME AND IDLE TIME IN PRODUCTION SITE X KIMIA FARMA PLANT JAKARTA
by: Kelana, Randy -
Minimizing the total completion time for parallel machine scheduling with job splitting and learning
by: Wang, Chenjie, et al.
Published: (2019) -
DESIGNING AND DETERMINING INVENTORY POLICY OF RAW MATERIAL WAREHOUSE WITH LIFE TIME CONSTRAINT AND WITH THE COMPARISON BETWEEN CLASS-BASED AND RANDOM STORAGE POLICIES (CASE STUDY : PT KIMIA FARMA TBK.)
by: FIRDAUSY CHAIRUNNISA NIM 13414073, AISHA -
Design Proposed for Raw Material Storage Using Assignment Problem Linear Programming in PT Kimia Farma Bandung
by: Ratman Triwibowo, Ilham -
Design Proposed for Raw Material Storage Using Assignment Problem Linear Programming in PT Kimia Farma Bandung
by: Ratman Triwibowo, Ilham