Geometrical Quality Checking for Francis Turbineâs Guide Vane
The Bakaru hydropower plant is a hydroelectric power plant that has a run off river type and was built to help electricity needs of 1030 GWH on average each year in the South Sulawesi and West Sulawesi regions by providing power of 2 x 63 MW. The Bakaru hydropower plant uses Francis turbines as pote...
Saved in:
Main Author: | Jeffin Farabi, Muhammad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/45834 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Design of Francis Turbine Guide Vane Geometry Measurement System
by: Akmal Firdaus, Yusril -
Design of Francis Turbine Guide Vane Geometry Measurement System
by: Akmal Firdaus, Yusril -
Machining Process and CNC Programming for Francis Turbine Guide Vane Manufacturing
by: Setyanto, Andreas -
Machining Process and CNC Programming for Francis Turbine Guide Vane Manufacturing
by: Setyanto, Andreas -
REVERSE ENGINEERING OF 63 MW FRANCIS TURBINE GUIDE VANE GEOMETRY IN PLTA BAKARU
by: Farkhan Rokhmatullah, Muhammad