APPLICATION OF LIFE CYCLE COST ANALYSIS (LCCA) IN SELECTING ALTERNATIVE PROGRAMS TO REDUCE DERATING (CASE STUDY OF PLTU NAGAN RAYA)

PLTU Nagan Raya is a steam power plant with 2 x 110 MW installed capacity located in Aceh. As the biggest power plant in Aceh, PLTU Nagan Raya also have important role in Sumatera Utara electricity system. Recently, within derating, PLTU Nagan Raya requires improvement to maintain its optimal c...

Full description

Saved in:
Bibliographic Details
Main Author: Dwi Prabowo, Yulianto
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/46189
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:46189
spelling id-itb.:461892020-02-21T12:59:13ZAPPLICATION OF LIFE CYCLE COST ANALYSIS (LCCA) IN SELECTING ALTERNATIVE PROGRAMS TO REDUCE DERATING (CASE STUDY OF PLTU NAGAN RAYA) Dwi Prabowo, Yulianto Indonesia Theses Life cycle cost analysis, pareto loss output (PLO) diagram, Weibull distribution approach, Monte Carlo simulation, EAF, EFOR, NCF. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/46189 PLTU Nagan Raya is a steam power plant with 2 x 110 MW installed capacity located in Aceh. As the biggest power plant in Aceh, PLTU Nagan Raya also have important role in Sumatera Utara electricity system. Recently, within derating, PLTU Nagan Raya requires improvement to maintain its optimal condition in term of cost, risk and performance. The purpose of this study is to perform an economic analysis toward derating and forced outage’s improvement programs by applying life cycle cost analysis (LCCA). In this research, the first approach is collecting forced outage historical data to recognise the equipments’ main problems. By using pareto loss output (PLO) diagram, it is known that unit 2 have greater outage which dominating by boiler tube leaks and refractory problems. The improvement programs grouped into five alternatives, then the data (forced outage hours) are processing within Weibull distribution approach’s software and Monte Carlo simulation. Its outputs are value of ?, ? and mean time to failure (MTTF), then calculated into the form of nett present value (NPV), total cost / benefit vs risk, and also performance indicators which are equivalent availability factor (EAF), equivalent forced outage rate (EFOR) and nett capacity factor (NCF) of each alternative program. Result of the research was found that alternative 5 (boiler pipe coating, refractory material’s modification and installing new last blade turbine) became a more effective choice. Alternative 5 has the largest nett present value (NPV), the lowest level of cost / benefit vs risk and cost of energy (CoE). In terms of performance, alternative 5 is a better choice with 86,44 % of EAF, EFOR of 15,22 % and electricity production ratio’s enhancement within 70 % of NCF. Based on the research, LCCA can be apply in selecting alternative programs to reduce power plant’s derating text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PLTU Nagan Raya is a steam power plant with 2 x 110 MW installed capacity located in Aceh. As the biggest power plant in Aceh, PLTU Nagan Raya also have important role in Sumatera Utara electricity system. Recently, within derating, PLTU Nagan Raya requires improvement to maintain its optimal condition in term of cost, risk and performance. The purpose of this study is to perform an economic analysis toward derating and forced outage’s improvement programs by applying life cycle cost analysis (LCCA). In this research, the first approach is collecting forced outage historical data to recognise the equipments’ main problems. By using pareto loss output (PLO) diagram, it is known that unit 2 have greater outage which dominating by boiler tube leaks and refractory problems. The improvement programs grouped into five alternatives, then the data (forced outage hours) are processing within Weibull distribution approach’s software and Monte Carlo simulation. Its outputs are value of ?, ? and mean time to failure (MTTF), then calculated into the form of nett present value (NPV), total cost / benefit vs risk, and also performance indicators which are equivalent availability factor (EAF), equivalent forced outage rate (EFOR) and nett capacity factor (NCF) of each alternative program. Result of the research was found that alternative 5 (boiler pipe coating, refractory material’s modification and installing new last blade turbine) became a more effective choice. Alternative 5 has the largest nett present value (NPV), the lowest level of cost / benefit vs risk and cost of energy (CoE). In terms of performance, alternative 5 is a better choice with 86,44 % of EAF, EFOR of 15,22 % and electricity production ratio’s enhancement within 70 % of NCF. Based on the research, LCCA can be apply in selecting alternative programs to reduce power plant’s derating
format Theses
author Dwi Prabowo, Yulianto
spellingShingle Dwi Prabowo, Yulianto
APPLICATION OF LIFE CYCLE COST ANALYSIS (LCCA) IN SELECTING ALTERNATIVE PROGRAMS TO REDUCE DERATING (CASE STUDY OF PLTU NAGAN RAYA)
author_facet Dwi Prabowo, Yulianto
author_sort Dwi Prabowo, Yulianto
title APPLICATION OF LIFE CYCLE COST ANALYSIS (LCCA) IN SELECTING ALTERNATIVE PROGRAMS TO REDUCE DERATING (CASE STUDY OF PLTU NAGAN RAYA)
title_short APPLICATION OF LIFE CYCLE COST ANALYSIS (LCCA) IN SELECTING ALTERNATIVE PROGRAMS TO REDUCE DERATING (CASE STUDY OF PLTU NAGAN RAYA)
title_full APPLICATION OF LIFE CYCLE COST ANALYSIS (LCCA) IN SELECTING ALTERNATIVE PROGRAMS TO REDUCE DERATING (CASE STUDY OF PLTU NAGAN RAYA)
title_fullStr APPLICATION OF LIFE CYCLE COST ANALYSIS (LCCA) IN SELECTING ALTERNATIVE PROGRAMS TO REDUCE DERATING (CASE STUDY OF PLTU NAGAN RAYA)
title_full_unstemmed APPLICATION OF LIFE CYCLE COST ANALYSIS (LCCA) IN SELECTING ALTERNATIVE PROGRAMS TO REDUCE DERATING (CASE STUDY OF PLTU NAGAN RAYA)
title_sort application of life cycle cost analysis (lcca) in selecting alternative programs to reduce derating (case study of pltu nagan raya)
url https://digilib.itb.ac.id/gdl/view/46189
_version_ 1822927284498071552