APPLICATION OF LIFE CYCLE COST ANALYSIS (LCCA) IN SELECTING ALTERNATIVE PROGRAMS TO REDUCE DERATING (CASE STUDY OF PLTU NAGAN RAYA)
PLTU Nagan Raya is a steam power plant with 2 x 110 MW installed capacity located in Aceh. As the biggest power plant in Aceh, PLTU Nagan Raya also have important role in Sumatera Utara electricity system. Recently, within derating, PLTU Nagan Raya requires improvement to maintain its optimal c...
Saved in:
Main Author: | Dwi Prabowo, Yulianto |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/46189 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
APPLICATION OF LIFE CYCLE COST ANALYSIS (LCCA) IN SELECTING ALTERNATIVE PROGRAMS TO REDUCE DERATING (CASE STUDY OF PLTU NAGAN RAYA)
by: Dwi Prabowo, Yulianto -
Life cycle cost analysis (LCCA) of PV-powered cooling systems with thermal energy and battery storage for off-grid applications
by: Luerssen, C, et al.
Published: (2020) -
LIFE CYCLE COST ANALYSIS (LCCA) PROJECT KPBU-AVAILABILITY PAYMENT ON EAST SUMATERA TRAFFIC ROAD PRESERVATION ACTIVITES IN SOUTH SUMATRA PROVINCE
by: Ardana Yunanda, Erick -
Tsunami, Migrasi Terpaksa, Dan Rencana pengungsi di Aceh Barat dan Nagan Raya
by: Perpustakaan UGM, i-lib
Published: (2005) -
IMPACT OF THRUST DERATE ON COMMERCIAL ENGINES
by: Man Singh Basnyat, Asheet