ESTIMATION OF OPERATION AND MAINTENANCE COST BASED ON POWER PLANT PERFORMANCE INDICATOR (CASE STUDY OF BARRU STEAM POWER PLANT CAPACITY 2 X 50 MW)
The purpose of this study is to determine the power plant performance indicators are most suitable for use in estimating power plant operation and maintenance costs. And to develop modeling the estimated operation and maintenance costs by using the power plant performance indicator that have been...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/46190 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | The purpose of this study is to determine the power plant performance indicators
are most suitable for use in estimating power plant operation and maintenance
costs. And to develop modeling the estimated operation and maintenance costs by
using the power plant performance indicator that have been selected.
The estimated operation and maintenance cost model developed in this study uses
a causal forecasting method with linear regression. Where in this study it is
assumed that the operation and maintenance cost variables have a mutually
influential relationship or causality with the variable performance indicator. There
are fourteen power plant performance indicators used in this study, namely
reliability, AF, EAF, SF, POF, MOF, UOF, SOF, FOF, FOR, EFOR, NCF, NOF
and EUOF. Then the correlation coefficient and determination data (r and r), and
estimation error (MAD, MSE, and MAPE) are used to select the power plant
performance indicator that are most appropriate in estimating plant operation and
maintenance costs.
Based on the calculation of the correlation coefficient, determination, and
estimation errors, it is obtained that NOF and EFOR are the most appropriate
variables for estimating power plant operation and maintenance costs. Where the
estimated cost equation is as follows : ???????????????????????????????????? ???????????????? = ?96,02 +
(438,75 × ????????????) and ???????????????????????????????????????????? ???????????????? = 108,60 (75,69× ????????????????).
The estimation equation model developed in this study can be used to estimate the
operation and maintenance costs of a 2 x 50 MW CFB power plant. And it is
possible to be used in other types of plants.
|
---|