ESTIMATION OF OPERATION AND MAINTENANCE COST BASED ON POWER PLANT PERFORMANCE INDICATOR (CASE STUDY OF BARRU STEAM POWER PLANT CAPACITY 2 X 50 MW)
The purpose of this study is to determine the power plant performance indicators are most suitable for use in estimating power plant operation and maintenance costs. And to develop modeling the estimated operation and maintenance costs by using the power plant performance indicator that have been...
Saved in:
Main Author: | Pandu Sasmito, Anung |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/46190 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
HEAT RATE GAP ANALYSIS ON STEAM POWER PLANT CAPACITY 220 MW
by: Adhi Kuncoro, Mahendra -
REVERSE ENGINEERING SUDU FORCE DRAFT FAN STEAM POWER PLANT 315 MW OF CAPACITY
by: Abdurrohim, Arif -
INVESTMENT ANALYSIS OF 50 MW GEOTHERMAL POWER PLANT FOR INDEPENDENT POWER PRODUCER IN EASTERN INDONESIA
by: Sihwan Abdullah, Muhammad -
CFD SIMULATION OF COFIRING OF COAL AND BIOMASS IN A600 MW STEAM POWER PLANT
by: Rahadian, Anugrah -
23.50 MW Caliraya hydroelectric power plant, Lumban, Laguna - Philippines
by: Juvida, Jules C.
Published: (2001)