FEASIBILITY STUDY OF CONVERSION FROM STEAM POWER PLANT AT CELUKAN BAWANG TO GAS POWER PLANT WITH NATURAL GAS FUEL.

Saved in:
Bibliographic Details
Main Author: Hidayat, Fadil
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/59674
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia