FEASIBILITY STUDY OF CONVERSION FROM STEAM POWER PLANT AT CELUKAN BAWANG TO GAS POWER PLANT WITH NATURAL GAS FUEL.
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/59674 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |