FEASIBILITY STUDY OF CONVERSION FROM STEAM POWER PLANT AT CELUKAN BAWANG TO GAS POWER PLANT WITH NATURAL GAS FUEL.

Saved in:
Bibliographic Details
Main Author: Hidayat, Fadil
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/59674
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:59674
spelling id-itb.:596742021-09-16T18:51:54ZFEASIBILITY STUDY OF CONVERSION FROM STEAM POWER PLANT AT CELUKAN BAWANG TO GAS POWER PLANT WITH NATURAL GAS FUEL. Hidayat, Fadil Indonesia Final Project MS17 INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/59674 text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description
format Final Project
author Hidayat, Fadil
spellingShingle Hidayat, Fadil
FEASIBILITY STUDY OF CONVERSION FROM STEAM POWER PLANT AT CELUKAN BAWANG TO GAS POWER PLANT WITH NATURAL GAS FUEL.
author_facet Hidayat, Fadil
author_sort Hidayat, Fadil
title FEASIBILITY STUDY OF CONVERSION FROM STEAM POWER PLANT AT CELUKAN BAWANG TO GAS POWER PLANT WITH NATURAL GAS FUEL.
title_short FEASIBILITY STUDY OF CONVERSION FROM STEAM POWER PLANT AT CELUKAN BAWANG TO GAS POWER PLANT WITH NATURAL GAS FUEL.
title_full FEASIBILITY STUDY OF CONVERSION FROM STEAM POWER PLANT AT CELUKAN BAWANG TO GAS POWER PLANT WITH NATURAL GAS FUEL.
title_fullStr FEASIBILITY STUDY OF CONVERSION FROM STEAM POWER PLANT AT CELUKAN BAWANG TO GAS POWER PLANT WITH NATURAL GAS FUEL.
title_full_unstemmed FEASIBILITY STUDY OF CONVERSION FROM STEAM POWER PLANT AT CELUKAN BAWANG TO GAS POWER PLANT WITH NATURAL GAS FUEL.
title_sort feasibility study of conversion from steam power plant at celukan bawang to gas power plant with natural gas fuel.
url https://digilib.itb.ac.id/gdl/view/59674
_version_ 1822931139431497728