FEASIBILITY STUDY OF CONVERSION FROM STEAM POWER PLANT AT CELUKAN BAWANG TO GAS POWER PLANT WITH NATURAL GAS FUEL.
Saved in:
Main Author: | Hidayat, Fadil |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/59674 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Financial Feasibility Study of Celukan Bawang Steam Power Plant Fuel Conversion from Coal to Natural Gas
by: Fajar Pratama, Kevin -
Development of Software for Simulation of Repowering Thermal Design in Steam Power Plant Using Gas Power Plant
by: Abdussalam, Zaki -
FINANCIAL FEASIBILITY STUDY OF GAS ENGINE POWER PLANT FUELED BY LANDFILL GAS - CASE STUDY PT XYZ
by: , Mohammad Riza, ST., et al.
Published: (2012) -
The economic feasibility study of a 100-MW Power-to-Gas plant
by: Miao, Bin, et al.
Published: (2021) -
FEASIBILITY STUDY FOR GAS POWER PLANT PROJECT IN KABUPATEN MUARA ENIM
by: Riusxander (NIM: 29110408) Pembimbing : Erman Sumirat, SE. AK., M.Bus, Harry