PENGUKURAN KINERJA MENGGUNAKAN OBJECTIVE MATRIX SEBAGAI CARA MENINGKATKAN PRODUKTIVITAS PROYEK (STUDI KASUS: PROYEK PEMASANGAN PIPELINE TUNU UTARA-I DI KALIMANTAN TIMUR OLEH PT TRANACO)

<b>Abstract :</b><p align="justify"> <br /> Improving productivity will implicate to increasing work performance and eventually increasing profitability. The way to increase performance of a company is to improve productivity of all management functional or work un...

Full description

Saved in:
Bibliographic Details
Main Author: Anggadinata (NIM : 28195058), Yusmar
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/4628
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:4628
spelling id-itb.:46282006-06-21T12:44:50ZPENGUKURAN KINERJA MENGGUNAKAN OBJECTIVE MATRIX SEBAGAI CARA MENINGKATKAN PRODUKTIVITAS PROYEK (STUDI KASUS: PROYEK PEMASANGAN PIPELINE TUNU UTARA-I DI KALIMANTAN TIMUR OLEH PT TRANACO) Anggadinata (NIM : 28195058), Yusmar Indonesia Theses Productivity, Work performance, Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/4628 <b>Abstract :</b><p align="justify"> <br /> Improving productivity will implicate to increasing work performance and eventually increasing profitability. The way to increase performance of a company is to improve productivity of all management functional or work units within organization of the company and also productivity of the product they produced. <br /> <br /> This final project implements a performance measurement in a pipeline installation project using a multi criteria performance system called objective matrix (OMAX). Performance measurement using OMAX will enable a company to evaluate the performance of each functional or work unit and their contribution to the total performance of the pipeline project. <br /> <br /> Knowing total performance index and performance index of work units within the orgTnization of the project will make the project manager able to analyse the work units that have an unexpected performance and allow the company to do what has to be done in project planning for the next coming pipeline project. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <b>Abstract :</b><p align="justify"> <br /> Improving productivity will implicate to increasing work performance and eventually increasing profitability. The way to increase performance of a company is to improve productivity of all management functional or work units within organization of the company and also productivity of the product they produced. <br /> <br /> This final project implements a performance measurement in a pipeline installation project using a multi criteria performance system called objective matrix (OMAX). Performance measurement using OMAX will enable a company to evaluate the performance of each functional or work unit and their contribution to the total performance of the pipeline project. <br /> <br /> Knowing total performance index and performance index of work units within the orgTnization of the project will make the project manager able to analyse the work units that have an unexpected performance and allow the company to do what has to be done in project planning for the next coming pipeline project.
format Theses
author Anggadinata (NIM : 28195058), Yusmar
spellingShingle Anggadinata (NIM : 28195058), Yusmar
PENGUKURAN KINERJA MENGGUNAKAN OBJECTIVE MATRIX SEBAGAI CARA MENINGKATKAN PRODUKTIVITAS PROYEK (STUDI KASUS: PROYEK PEMASANGAN PIPELINE TUNU UTARA-I DI KALIMANTAN TIMUR OLEH PT TRANACO)
author_facet Anggadinata (NIM : 28195058), Yusmar
author_sort Anggadinata (NIM : 28195058), Yusmar
title PENGUKURAN KINERJA MENGGUNAKAN OBJECTIVE MATRIX SEBAGAI CARA MENINGKATKAN PRODUKTIVITAS PROYEK (STUDI KASUS: PROYEK PEMASANGAN PIPELINE TUNU UTARA-I DI KALIMANTAN TIMUR OLEH PT TRANACO)
title_short PENGUKURAN KINERJA MENGGUNAKAN OBJECTIVE MATRIX SEBAGAI CARA MENINGKATKAN PRODUKTIVITAS PROYEK (STUDI KASUS: PROYEK PEMASANGAN PIPELINE TUNU UTARA-I DI KALIMANTAN TIMUR OLEH PT TRANACO)
title_full PENGUKURAN KINERJA MENGGUNAKAN OBJECTIVE MATRIX SEBAGAI CARA MENINGKATKAN PRODUKTIVITAS PROYEK (STUDI KASUS: PROYEK PEMASANGAN PIPELINE TUNU UTARA-I DI KALIMANTAN TIMUR OLEH PT TRANACO)
title_fullStr PENGUKURAN KINERJA MENGGUNAKAN OBJECTIVE MATRIX SEBAGAI CARA MENINGKATKAN PRODUKTIVITAS PROYEK (STUDI KASUS: PROYEK PEMASANGAN PIPELINE TUNU UTARA-I DI KALIMANTAN TIMUR OLEH PT TRANACO)
title_full_unstemmed PENGUKURAN KINERJA MENGGUNAKAN OBJECTIVE MATRIX SEBAGAI CARA MENINGKATKAN PRODUKTIVITAS PROYEK (STUDI KASUS: PROYEK PEMASANGAN PIPELINE TUNU UTARA-I DI KALIMANTAN TIMUR OLEH PT TRANACO)
title_sort pengukuran kinerja menggunakan objective matrix sebagai cara meningkatkan produktivitas proyek (studi kasus: proyek pemasangan pipeline tunu utara-i di kalimantan timur oleh pt tranaco)
url https://digilib.itb.ac.id/gdl/view/4628
_version_ 1820663449995182080