PENGUKURAN KINERJA MENGGUNAKAN OBJECTIVE MATRIX SEBAGAI CARA MENINGKATKAN PRODUKTIVITAS PROYEK (STUDI KASUS: PROYEK PEMASANGAN PIPELINE TUNU UTARA-I DI KALIMANTAN TIMUR OLEH PT TRANACO)
<b>Abstract :</b><p align="justify"> <br /> Improving productivity will implicate to increasing work performance and eventually increasing profitability. The way to increase performance of a company is to improve productivity of all management functional or work un...
Saved in:
Main Author: | Anggadinata (NIM : 28195058), Yusmar |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/4628 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PERENCANAAN ORGANISASI, SISTEM & PROSEDUR DAN PENETAPAN PRIORITAS DALAM MANAJEMEN MULTI PROYEK (STUDI KASUS : PT TRANACO)
by: TYAS ASMARA , ARIEF -
RISK ASSESSMENT KECELAKAAN KERJA PEMASANGAN BETON PRACETAK PADA PROYEK PEMBANGUNAN APARTEMEN DI SURABAYA
by: Reko Triyono, et al.
Published: (2017) -
PENGUKURAN SUHU BETON ( THERMOCOUPLES ) UNTUK PENGECORAN MASS CONCRETE PROYEK SHERWOOD RESIDENCE APARTMENTS KELAPA GADING - JAKARTA UTARA
by: , EMPU WIJOYO MULYO, et al.
Published: (2013) -
SISTEM INFORMASI PENGELOLAAN PERMINTAAN MATERIAL KONSTRUKSI PROYEK KALISOGO-WARU GAS DISTRIBUTION PIPELINE PADA KANTOR PROYEK PT. JFE ENGINEERING CORPORATION INDONESIA
by: NANDA SUBA MERISKA PUTRI, 081310113008
Published: (2016) -
PERBAIKAN SISTEM PENGENDALIAN PROYEK PADA OPERASI PROYEK - PROYEK PT PJB SERVICES
by: Rachmatullah