BLOWDOWN BOILER MASS FLOW SIMULATION IN MAINTAINING RELIABILITY AND EFFICIENCY OF COAL FIRED STEAM POWER PLANT (CASE STUDY IN PLTU OMBILIN 2 X 100 MW)
The concentration of impurities in the steam drum boiler is an important factor that must be maintained to maintain the reliabilityof the power plant. One of the efforts made is to blowdown. Boiler blowdown is carried out to drain water out of the steam drum. Mass flow rate and duration of blowdo...
Saved in:
Main Author: | Sefriadi, Odi |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/46436 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
BLOWDOWN HEAT ENERGY RECOVERY OF CIRCULATING FLUIDIZED BED BOILER IN PLTU 60 MW CAPACITY
by: Meidasari, Memey -
HEAT RATE GAP ANALYSIS BASED ON EPRI AND HEAT BALANCE METHOD (CASE STUDY in PLTU OMBILIN 2 X 100 MW)
by: Daniel Sihaloho, Ridho -
EFFECT OF EXCESS AIR ON COAL COMBUSTION OF A 265 MW TANGENTIAL FIRED BOILER
by: Ananto Pramudyo, Dwi -
DESIGN OF WASTE HEAT UTILIZATION SYSTEM IN BLOWDOWN PROCESS IN BOILER
by: Nanda Utama, Rizki -
EFFECT OF AMMONIA INJECTION LOCATION ON CO-FIRING OF COAL-AMMONIA IN A FRONT-REAR PULVERIZED BOILER OF 1000 MW ULTRA SUPER CRITICAL COAL-FIRED POWER PLANT
by: Haykal Ahmad, Azaria