REDESIGN AND OPTIMIZATION OF WASTE MANAGEMENT SYSTEM IN TPS 3R SUBANG, ANTAPANI SUBDISTRICT, BANDUNG CITY

Subang Temporary Storage Site (TPS 3R Subang) is located at Jalan Subang No. 1, Antapani District, Bandung City. It has a land area of 594 m2. Waste management in TPS 3R Subang is not optimal in applying the principles of reduce, reuse, and recycle because there are several abandoned facilities,...

Full description

Saved in:
Bibliographic Details
Main Author: Resti Anjany, Gina
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/46865
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:46865
spelling id-itb.:468652020-03-12T15:25:54ZREDESIGN AND OPTIMIZATION OF WASTE MANAGEMENT SYSTEM IN TPS 3R SUBANG, ANTAPANI SUBDISTRICT, BANDUNG CITY Resti Anjany, Gina Teknik saniter dan perkotaan; teknik perlindungan lingkungan Indonesia Final Project Optimization; sorting; handling; processing; change; redesign INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/46865 Subang Temporary Storage Site (TPS 3R Subang) is located at Jalan Subang No. 1, Antapani District, Bandung City. It has a land area of 594 m2. Waste management in TPS 3R Subang is not optimal in applying the principles of reduce, reuse, and recycle because there are several abandoned facilities, processes that are not carried out continuously, and excess capacity so the redesign and optimization of the waste management system needs to be done. Changes in service areas were made because expansion of the TPS was not possible. Changes in service areas can be made because some TPS 3R Subang service areas are not located in Antapani District and there are other TPS that are closer to the area. The new service area only covers the Antapani Kulon Village. Antapani Kulon Urban Village was chosen because there were no temporary storage site in the area. TPS 3R Subang is planned to have facilities for sorting areas, processing organic waste, handling inorganic waste, and handling residual waste. With the planned system, at the end of the operational year, this TPS has a capacity of 6078 kg/day. Sorting is done manually with conveyor belt. The sorted inorganic waste is paper, plastic, glass and metal waste with a total of 732 kg/day. Organic waste of 1870 kg/day will be processed with an open windrow composting technology system. Untreated and residual waste are collected in 10 m3 containers and then transported to the landfill one visit per day. Analysis using Net Present Value method shows that the NPV is less than 0, which is -IDR 2,675,462,162,13. Even though NPV <0, the construction of the 3R TPS redesign cannot be said to be directly economically unfeasible. This is because the main objective of the 3R TPS redesign is to improve solid waste services in a comprehensive manner so as to reduce the volume of waste to the landfill and other losses that might be incurred if the redesign of the TPS 3R is not carried out. The management fee per tonne of waste is IDR 438,061.00 and the minimum waste collection fee that must be paid by residents who live in the TPS 3R Jalan Subang service area if the initial investment cost of construction is borne by the Government is IDR 51,700.00/KK/month so that the TPS does not suffer losses. However, if the initial investment costs are not borne by the Government, then the cost of collecting waste that must be paid by residents living in the TPS 3R Jalan Subang service area is Rp. 90,300.00/KK/month. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik saniter dan perkotaan; teknik perlindungan lingkungan
spellingShingle Teknik saniter dan perkotaan; teknik perlindungan lingkungan
Resti Anjany, Gina
REDESIGN AND OPTIMIZATION OF WASTE MANAGEMENT SYSTEM IN TPS 3R SUBANG, ANTAPANI SUBDISTRICT, BANDUNG CITY
description Subang Temporary Storage Site (TPS 3R Subang) is located at Jalan Subang No. 1, Antapani District, Bandung City. It has a land area of 594 m2. Waste management in TPS 3R Subang is not optimal in applying the principles of reduce, reuse, and recycle because there are several abandoned facilities, processes that are not carried out continuously, and excess capacity so the redesign and optimization of the waste management system needs to be done. Changes in service areas were made because expansion of the TPS was not possible. Changes in service areas can be made because some TPS 3R Subang service areas are not located in Antapani District and there are other TPS that are closer to the area. The new service area only covers the Antapani Kulon Village. Antapani Kulon Urban Village was chosen because there were no temporary storage site in the area. TPS 3R Subang is planned to have facilities for sorting areas, processing organic waste, handling inorganic waste, and handling residual waste. With the planned system, at the end of the operational year, this TPS has a capacity of 6078 kg/day. Sorting is done manually with conveyor belt. The sorted inorganic waste is paper, plastic, glass and metal waste with a total of 732 kg/day. Organic waste of 1870 kg/day will be processed with an open windrow composting technology system. Untreated and residual waste are collected in 10 m3 containers and then transported to the landfill one visit per day. Analysis using Net Present Value method shows that the NPV is less than 0, which is -IDR 2,675,462,162,13. Even though NPV <0, the construction of the 3R TPS redesign cannot be said to be directly economically unfeasible. This is because the main objective of the 3R TPS redesign is to improve solid waste services in a comprehensive manner so as to reduce the volume of waste to the landfill and other losses that might be incurred if the redesign of the TPS 3R is not carried out. The management fee per tonne of waste is IDR 438,061.00 and the minimum waste collection fee that must be paid by residents who live in the TPS 3R Jalan Subang service area if the initial investment cost of construction is borne by the Government is IDR 51,700.00/KK/month so that the TPS does not suffer losses. However, if the initial investment costs are not borne by the Government, then the cost of collecting waste that must be paid by residents living in the TPS 3R Jalan Subang service area is Rp. 90,300.00/KK/month.
format Final Project
author Resti Anjany, Gina
author_facet Resti Anjany, Gina
author_sort Resti Anjany, Gina
title REDESIGN AND OPTIMIZATION OF WASTE MANAGEMENT SYSTEM IN TPS 3R SUBANG, ANTAPANI SUBDISTRICT, BANDUNG CITY
title_short REDESIGN AND OPTIMIZATION OF WASTE MANAGEMENT SYSTEM IN TPS 3R SUBANG, ANTAPANI SUBDISTRICT, BANDUNG CITY
title_full REDESIGN AND OPTIMIZATION OF WASTE MANAGEMENT SYSTEM IN TPS 3R SUBANG, ANTAPANI SUBDISTRICT, BANDUNG CITY
title_fullStr REDESIGN AND OPTIMIZATION OF WASTE MANAGEMENT SYSTEM IN TPS 3R SUBANG, ANTAPANI SUBDISTRICT, BANDUNG CITY
title_full_unstemmed REDESIGN AND OPTIMIZATION OF WASTE MANAGEMENT SYSTEM IN TPS 3R SUBANG, ANTAPANI SUBDISTRICT, BANDUNG CITY
title_sort redesign and optimization of waste management system in tps 3r subang, antapani subdistrict, bandung city
url https://digilib.itb.ac.id/gdl/view/46865
_version_ 1822271304988884992