DESIGN OF DRINKING WATER SUPPLY SYSTEM KALIJATI AT PDAM TIRTA RANGGA, SUBANG REGENCY

Abstract: Subang Regency has a population of 1,562,509 people. The drinking water supply system for the Subang Regency was welcomed by the Tirta Rangga PDAM, which has only been served with clean water for 274,300 inhabitants. Kalijati and Dawuan Sub-districts are areas with a low number of air serv...

Full description

Saved in:
Bibliographic Details
Main Author: Yulianti
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/47002
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:47002
spelling id-itb.:470022020-03-13T14:50:06ZDESIGN OF DRINKING WATER SUPPLY SYSTEM KALIJATI AT PDAM TIRTA RANGGA, SUBANG REGENCY Yulianti Teknik saniter dan perkotaan; teknik perlindungan lingkungan Indonesia Final Project raw water, alternative units, quality standard, WTP, service level INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/47002 Abstract: Subang Regency has a population of 1,562,509 people. The drinking water supply system for the Subang Regency was welcomed by the Tirta Rangga PDAM, which has only been served with clean water for 274,300 inhabitants. Kalijati and Dawuan Sub-districts are areas with a low number of air services. Based on the Subang District Water Supply Management System (RISPAM) Master Plan (2014), the PDAM has developed a SPAM Improvement program in the Kalijati and Dawuan Districts with a 10-year planning period (2020-2030) that could increase service capacity to 80% previously 38%. The source of raw water from the IPA is the Cibodas river because it has sufficient and continuous discharge during the dry season. After analyzing the raw water quality, five air quality parameters were carried out based on the Minister of Health Regulation number 492 of 2010 which did not meet the quality standard standards, namely color, turbidity, iron, total coliform, and e. coli. By analyzing the parameters that need to be processed against SNI 7508: 2011 and the JICA prediction model (1990), the water treatment process is selected based on conventional which includes aeration, coagulation, flocculation, sedimentation, filtration, and disinfection. Based on consideration of land requirements, operational and maintenance technical aspects, as well as economics, alternative units were selected using weighting methods approved by cascade aerators as aeration units, inline static mixers as coagulation units, baffle ducts as flocculation units, and settler rectangular tubing units as sedimentation units , fast sand filtering as a filtration unit, chlorine (Ca (OCl) 2) as a disinfectant chemical disinfection unit, and ground reservoir as a reservoir unit. Economically, the construction of the Kalijati New SPAM is eligible because it has to meet the requirements of NPV> 0 and BCR> 1. Estimated additional expenditure budget, so the NPV value is Rp. 100,273,174,281 while BCR value is 1.25. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik saniter dan perkotaan; teknik perlindungan lingkungan
spellingShingle Teknik saniter dan perkotaan; teknik perlindungan lingkungan
Yulianti
DESIGN OF DRINKING WATER SUPPLY SYSTEM KALIJATI AT PDAM TIRTA RANGGA, SUBANG REGENCY
description Abstract: Subang Regency has a population of 1,562,509 people. The drinking water supply system for the Subang Regency was welcomed by the Tirta Rangga PDAM, which has only been served with clean water for 274,300 inhabitants. Kalijati and Dawuan Sub-districts are areas with a low number of air services. Based on the Subang District Water Supply Management System (RISPAM) Master Plan (2014), the PDAM has developed a SPAM Improvement program in the Kalijati and Dawuan Districts with a 10-year planning period (2020-2030) that could increase service capacity to 80% previously 38%. The source of raw water from the IPA is the Cibodas river because it has sufficient and continuous discharge during the dry season. After analyzing the raw water quality, five air quality parameters were carried out based on the Minister of Health Regulation number 492 of 2010 which did not meet the quality standard standards, namely color, turbidity, iron, total coliform, and e. coli. By analyzing the parameters that need to be processed against SNI 7508: 2011 and the JICA prediction model (1990), the water treatment process is selected based on conventional which includes aeration, coagulation, flocculation, sedimentation, filtration, and disinfection. Based on consideration of land requirements, operational and maintenance technical aspects, as well as economics, alternative units were selected using weighting methods approved by cascade aerators as aeration units, inline static mixers as coagulation units, baffle ducts as flocculation units, and settler rectangular tubing units as sedimentation units , fast sand filtering as a filtration unit, chlorine (Ca (OCl) 2) as a disinfectant chemical disinfection unit, and ground reservoir as a reservoir unit. Economically, the construction of the Kalijati New SPAM is eligible because it has to meet the requirements of NPV> 0 and BCR> 1. Estimated additional expenditure budget, so the NPV value is Rp. 100,273,174,281 while BCR value is 1.25.
format Final Project
author Yulianti
author_facet Yulianti
author_sort Yulianti
title DESIGN OF DRINKING WATER SUPPLY SYSTEM KALIJATI AT PDAM TIRTA RANGGA, SUBANG REGENCY
title_short DESIGN OF DRINKING WATER SUPPLY SYSTEM KALIJATI AT PDAM TIRTA RANGGA, SUBANG REGENCY
title_full DESIGN OF DRINKING WATER SUPPLY SYSTEM KALIJATI AT PDAM TIRTA RANGGA, SUBANG REGENCY
title_fullStr DESIGN OF DRINKING WATER SUPPLY SYSTEM KALIJATI AT PDAM TIRTA RANGGA, SUBANG REGENCY
title_full_unstemmed DESIGN OF DRINKING WATER SUPPLY SYSTEM KALIJATI AT PDAM TIRTA RANGGA, SUBANG REGENCY
title_sort design of drinking water supply system kalijati at pdam tirta rangga, subang regency
url https://digilib.itb.ac.id/gdl/view/47002
_version_ 1822271347344015360