PENGEMBANGAN METODA PENENTUAN DUE DATE ORDER TOOLS BONDING COMPOSITE DI PT IPTN
<b>Abstract :</b><p align=\"justify\"> <br /> <br /> The ability of tools shop to deliver tool manufacturing order on time according to the need schedule of the requiring part is very important. The reason is that failure to complete tools on time may cause...
Saved in:
Main Author: | Abror (NIM : 23494026), Nadjamuddin |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/4707 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PENGEMBANGAN METODA PENEMPATAN ORDER PADA BAHAN BAKU UNTUK MEMAKSIMALKAN PEMAKAIAN BAHAN BAKU STUDI KASUS : BENGKEL SHEET METAL FORMING PT IPTN BANDUNG)
by: (NIM : 23494037), Santosa -
PENGEMBANGAN TEKNOLOGI KELOMPOK UNTUK PERENCANAAN PROSES PEMESINAN DI PT. IPTN
by: Fretes Anthon, De -
PERUMUSAN STRATEGI PEMASARAN DIVISI PURNA JUAL PT. IPTN
by: HP. Entum (NIM 28195062), Eddy -
In Strategic Management System. <br />
In Aircraft Services Division. PT IPTN. <br />
by: Hasby, Indra -
Analisis determinan efektivitas organisasi universal maintenance center (UMC) sebagai profit center PT IPTN
by: , RINI, Tri Daya, et al.
Published: (1997)