DEVELOPMENT OF A PRODUCT ORDER COMPLETION PROGRESS MONITORING SYSTEM: A CASE STUDY OF A TRAIN AC PRODUCTION UNIT

One of the principles of Industry 4.0 is the implementation of CPS (Cyber Physical System). CPS implementation is divided into five levels, namely the connection level, conversion level, cyber level, cognition level, and configuration level. Connection levels focus on sensors and wireless communi...

Full description

Saved in:
Bibliographic Details
Main Author: Fauzi, Helmi
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/47397
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:47397
spelling id-itb.:473972020-04-29T10:40:42ZDEVELOPMENT OF A PRODUCT ORDER COMPLETION PROGRESS MONITORING SYSTEM: A CASE STUDY OF A TRAIN AC PRODUCTION UNIT Fauzi, Helmi Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Final Project Monitoring system, progress, product order completion INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/47397 One of the principles of Industry 4.0 is the implementation of CPS (Cyber Physical System). CPS implementation is divided into five levels, namely the connection level, conversion level, cyber level, cognition level, and configuration level. Connection levels focus on sensors and wireless communication devices to monitor real conditions on production elements. The raw data obtained needs to be converted into useful information using data analysis on the implementation of the second level on the CPS, namely the conversion level. One of the information that can be generated from data analysis is the progress of completing product orders. Production unit which become case study object in this research manufactures AC for train. Currently the production unit already installed devices that can be used by operators to enter data at each work station. The purpose of this study is to determine the method of data analysis and create a system for monitoring the completion progress of product order. Progress is determined by comparing the scheduled total duration for all operations that have been carried out with the scheduled total duration for all operations. This study succeeded in determining the method of data analysis and creating monitoring system. The system successfully analyzes the raw data from the train AC production unit to become information in the form of progress in completing product orders and displays the results on the interface to the user. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Fauzi, Helmi
DEVELOPMENT OF A PRODUCT ORDER COMPLETION PROGRESS MONITORING SYSTEM: A CASE STUDY OF A TRAIN AC PRODUCTION UNIT
description One of the principles of Industry 4.0 is the implementation of CPS (Cyber Physical System). CPS implementation is divided into five levels, namely the connection level, conversion level, cyber level, cognition level, and configuration level. Connection levels focus on sensors and wireless communication devices to monitor real conditions on production elements. The raw data obtained needs to be converted into useful information using data analysis on the implementation of the second level on the CPS, namely the conversion level. One of the information that can be generated from data analysis is the progress of completing product orders. Production unit which become case study object in this research manufactures AC for train. Currently the production unit already installed devices that can be used by operators to enter data at each work station. The purpose of this study is to determine the method of data analysis and create a system for monitoring the completion progress of product order. Progress is determined by comparing the scheduled total duration for all operations that have been carried out with the scheduled total duration for all operations. This study succeeded in determining the method of data analysis and creating monitoring system. The system successfully analyzes the raw data from the train AC production unit to become information in the form of progress in completing product orders and displays the results on the interface to the user.
format Final Project
author Fauzi, Helmi
author_facet Fauzi, Helmi
author_sort Fauzi, Helmi
title DEVELOPMENT OF A PRODUCT ORDER COMPLETION PROGRESS MONITORING SYSTEM: A CASE STUDY OF A TRAIN AC PRODUCTION UNIT
title_short DEVELOPMENT OF A PRODUCT ORDER COMPLETION PROGRESS MONITORING SYSTEM: A CASE STUDY OF A TRAIN AC PRODUCTION UNIT
title_full DEVELOPMENT OF A PRODUCT ORDER COMPLETION PROGRESS MONITORING SYSTEM: A CASE STUDY OF A TRAIN AC PRODUCTION UNIT
title_fullStr DEVELOPMENT OF A PRODUCT ORDER COMPLETION PROGRESS MONITORING SYSTEM: A CASE STUDY OF A TRAIN AC PRODUCTION UNIT
title_full_unstemmed DEVELOPMENT OF A PRODUCT ORDER COMPLETION PROGRESS MONITORING SYSTEM: A CASE STUDY OF A TRAIN AC PRODUCTION UNIT
title_sort development of a product order completion progress monitoring system: a case study of a train ac production unit
url https://digilib.itb.ac.id/gdl/view/47397
_version_ 1821999869921853440