DEVELOPMENT OF A PRODUCT ORDER COMPLETION PROGRESS MONITORING SYSTEM: A CASE STUDY OF A TRAIN AC PRODUCTION UNIT
One of the principles of Industry 4.0 is the implementation of CPS (Cyber Physical System). CPS implementation is divided into five levels, namely the connection level, conversion level, cyber level, cognition level, and configuration level. Connection levels focus on sensors and wireless communi...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/47397 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:47397 |
---|---|
spelling |
id-itb.:473972020-04-29T10:40:42ZDEVELOPMENT OF A PRODUCT ORDER COMPLETION PROGRESS MONITORING SYSTEM: A CASE STUDY OF A TRAIN AC PRODUCTION UNIT Fauzi, Helmi Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Final Project Monitoring system, progress, product order completion INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/47397 One of the principles of Industry 4.0 is the implementation of CPS (Cyber Physical System). CPS implementation is divided into five levels, namely the connection level, conversion level, cyber level, cognition level, and configuration level. Connection levels focus on sensors and wireless communication devices to monitor real conditions on production elements. The raw data obtained needs to be converted into useful information using data analysis on the implementation of the second level on the CPS, namely the conversion level. One of the information that can be generated from data analysis is the progress of completing product orders. Production unit which become case study object in this research manufactures AC for train. Currently the production unit already installed devices that can be used by operators to enter data at each work station. The purpose of this study is to determine the method of data analysis and create a system for monitoring the completion progress of product order. Progress is determined by comparing the scheduled total duration for all operations that have been carried out with the scheduled total duration for all operations. This study succeeded in determining the method of data analysis and creating monitoring system. The system successfully analyzes the raw data from the train AC production unit to become information in the form of progress in completing product orders and displays the results on the interface to the user. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Teknik (Rekayasa, enjinering dan kegiatan berkaitan) |
spellingShingle |
Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Fauzi, Helmi DEVELOPMENT OF A PRODUCT ORDER COMPLETION PROGRESS MONITORING SYSTEM: A CASE STUDY OF A TRAIN AC PRODUCTION UNIT |
description |
One of the principles of Industry 4.0 is the implementation of CPS (Cyber
Physical System). CPS implementation is divided into five levels, namely the
connection level, conversion level, cyber level, cognition level, and configuration
level. Connection levels focus on sensors and wireless communication devices to
monitor real conditions on production elements. The raw data obtained needs to
be converted into useful information using data analysis on the implementation
of the second level on the CPS, namely the conversion level. One of the
information that can be generated from data analysis is the progress of completing
product orders.
Production unit which become case study object in this research
manufactures AC for train. Currently the production unit already installed devices
that can be used by operators to enter data at each work station. The purpose of
this study is to determine the method of data analysis and create a system for
monitoring the completion progress of product order. Progress is determined by
comparing the scheduled total duration for all operations that have been carried
out with the scheduled total duration for all operations.
This study succeeded in determining the method of data analysis and
creating monitoring system. The system successfully analyzes the raw data from
the train AC production unit to become information in the form of progress in
completing product orders and displays the results on the interface to the user. |
format |
Final Project |
author |
Fauzi, Helmi |
author_facet |
Fauzi, Helmi |
author_sort |
Fauzi, Helmi |
title |
DEVELOPMENT OF A PRODUCT ORDER COMPLETION PROGRESS MONITORING SYSTEM: A CASE STUDY OF A TRAIN AC PRODUCTION UNIT |
title_short |
DEVELOPMENT OF A PRODUCT ORDER COMPLETION PROGRESS MONITORING SYSTEM: A CASE STUDY OF A TRAIN AC PRODUCTION UNIT |
title_full |
DEVELOPMENT OF A PRODUCT ORDER COMPLETION PROGRESS MONITORING SYSTEM: A CASE STUDY OF A TRAIN AC PRODUCTION UNIT |
title_fullStr |
DEVELOPMENT OF A PRODUCT ORDER COMPLETION PROGRESS MONITORING SYSTEM: A CASE STUDY OF A TRAIN AC PRODUCTION UNIT |
title_full_unstemmed |
DEVELOPMENT OF A PRODUCT ORDER COMPLETION PROGRESS MONITORING SYSTEM: A CASE STUDY OF A TRAIN AC PRODUCTION UNIT |
title_sort |
development of a product order completion progress monitoring system: a case study of a train ac production unit |
url |
https://digilib.itb.ac.id/gdl/view/47397 |
_version_ |
1821999869921853440 |