INDUSTRY 4.0 INTEGRATION WITH LEAN PRODUCTION SYSTEM TO BUILD VIRTUAL SYSTEM ON THE ASSEMBLY INDUSTRY
A production planning will give maximum value if it’s supported with sufficient information flow including actual and real time operation information from shop floor in an assembly industry. However, current information flow from shop floor is paper based without proper archiving and can’t be wel...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/47408 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!