MEASURING AND ANALYSING FINANCIAL PERFORMANCE OF COAL MINING COMPANIES LISTED ON THE INDONESIA STOCK EXCHANGE BEFORE AND AFTER THE IMPLEMENTATION OF FAST TRACK PROGRAM 35,000 MEGA WATT OF 2016
The need to get clean and healthy air is one of the basic human needs and must be fulfilled equally to everyone to continue to live. Government through Presidential Regulation No. 4 of 2016, which was later amended in Presidential Regulation No. 14 of 2017 aims to accelerate the development of elect...
Saved in:
Main Author: | Giovani, Maestro |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/47577 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
CAPITAL STRUCTURE ANALYSIS FOR 35.000 MW ELECTRICITY PROJECT (CASE STUDY: PT PLN PERSERO)
by: Putri Nirbaya, Marita -
To study the commercial and operational advantages and disadvantages of mega containerships (>14,000TEU) : mega containerships and alliances (part III)
by: Lee, Cheok Wing
Published: (2014) -
PRARANCANGAN PABRIK MONOKLOBENZENE DARI BENZENE DAN KLORIN KAPASITAS 35000 TON/TAHUN
by: , BHINARTA WINDU S, et al.
Published: (2014) -
Reply to Watt
by: Tri Wangrangsimakul, et al.
Published: (2020) -
To study the commercial and operational advantages and disadvantages of mega-container ships (>14,000TEU)
by: Lai, Marie Jinbao
Published: (2014)