RELIABILITY ANALYSIS OF NANJUNG TUNNEL
Nanjung Tunnel is used for shortening the retention time of flooding in Baleendah, Dayeuhkolot and its surroundings. For sustainability purposes therefor reliability analysis is required. Reliability analysis comes from qualitative methode which is two level risk analysis, level 1(Safety factor)...
Saved in:
主要作者: | |
---|---|
格式: | Theses |
語言: | Indonesia |
主題: | |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/47690 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|