RELIABILITY ANALYSIS OF NANJUNG TUNNEL
Nanjung Tunnel is used for shortening the retention time of flooding in Baleendah, Dayeuhkolot and its surroundings. For sustainability purposes therefor reliability analysis is required. Reliability analysis comes from qualitative methode which is two level risk analysis, level 1(Safety factor)...
Saved in:
Main Author: | Fajar Somahartadi, Tiko |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/47690 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS OF INCREASING RELIABILITY AND AVAILABILITY THROUGH MAINTENANCE PROGRAM IMPROVEMENTS OF 1 MW CIRATA SOLAR POWER PLANT USING RELIABILITY CENTERED MAINTENANCE
by: Fakhrul Muqauwim, Muhammad -
RELIABILITY ANALYSIS OF THE PRELIMINARY DESIGN OF METROCAPSULE BRAKING SYSTEM USING FAILURE MODE EFFECT AND CRITICALITY ANALYSIS METHOD
by: Thouf Fairuza, Indrayana -
RELIABILITY ANALYSIS FOR PIPELINE SHIFTING USING DAVIT LIFT AT NORTHERN PATIMBAN SEA, WEST JAVA
by: Hasan Taherdito, Achmad -
ENVIRONMENTAL LOAD FACTOR CALIBRATION FOR THREE-LEGGED JACKET PLATFORM IN MADURA STRAIT WITH RELIABILITY ANALYSIS METHOD
by: Axel -
DEVELOPMENT OF MEASUREMENTâS RELIABILITY AND ACCURACY FOR TIMING GATE SYSTEM
by: Barnaby Wirantono Goeij, Ethan