FLOOD CONTROL CONSTRUCTION PLANNING IN TAMIANG WATERSHED, ACEH PROVINCE
To overcome the problem of annual floods and flash floods that occur in the Tamiang watershed, Aceh Province, especially in Aceh Tamiang District, it is necessary to plan the construction of flood control in order to overcome floods problem that can be completed or can be reduced, so that they ca...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/48004 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:48004 |
---|---|
spelling |
id-itb.:480042020-06-25T12:08:16ZFLOOD CONTROL CONSTRUCTION PLANNING IN TAMIANG WATERSHED, ACEH PROVINCE Hambali, Ahmad Indonesia Final Project Tamiang Watershed, Aceh Tamiang District, Flood Control Construction. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/48004 To overcome the problem of annual floods and flash floods that occur in the Tamiang watershed, Aceh Province, especially in Aceh Tamiang District, it is necessary to plan the construction of flood control in order to overcome floods problem that can be completed or can be reduced, so that they can be analyzed. which is a priority to do, then a hydrological analysis is carried out to get the flood plan discharge, tidal analysis to get the boundary conditions in the downstream of the Tamiang watershed, then hydraulic analysis for the existing conditions with flood height data assistance uses primary data obtained from surveys and interviews to floods locations. After the existing flood has been verified, a hydraulic analysis is carried out for each requested flood treatment, then the treatment is ranked for which treatment is most beneficial in terms of regulation, economic aspects, duration, construction, and advantage aspects. After the most suitable flood control construction is selected, detailed design, stability analysis, BOQ and RAB analysis, and economic analysis is carried out, text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
To overcome the problem of annual floods and flash floods that occur in the Tamiang
watershed, Aceh Province, especially in Aceh Tamiang District, it is necessary to plan the
construction of flood control in order to overcome floods problem that can be completed or
can be reduced, so that they can be analyzed. which is a priority to do, then a hydrological
analysis is carried out to get the flood plan discharge, tidal analysis to get the boundary
conditions in the downstream of the Tamiang watershed, then hydraulic analysis for the
existing conditions with flood height data assistance uses primary data obtained from
surveys and interviews to floods locations. After the existing flood has been verified, a
hydraulic analysis is carried out for each requested flood treatment, then the treatment is
ranked for which treatment is most beneficial in terms of regulation, economic aspects,
duration, construction, and advantage aspects. After the most suitable flood control
construction is selected, detailed design, stability analysis, BOQ and RAB analysis, and
economic analysis is carried out,
|
format |
Final Project |
author |
Hambali, Ahmad |
spellingShingle |
Hambali, Ahmad FLOOD CONTROL CONSTRUCTION PLANNING IN TAMIANG WATERSHED, ACEH PROVINCE |
author_facet |
Hambali, Ahmad |
author_sort |
Hambali, Ahmad |
title |
FLOOD CONTROL CONSTRUCTION PLANNING IN TAMIANG WATERSHED, ACEH PROVINCE |
title_short |
FLOOD CONTROL CONSTRUCTION PLANNING IN TAMIANG WATERSHED, ACEH PROVINCE |
title_full |
FLOOD CONTROL CONSTRUCTION PLANNING IN TAMIANG WATERSHED, ACEH PROVINCE |
title_fullStr |
FLOOD CONTROL CONSTRUCTION PLANNING IN TAMIANG WATERSHED, ACEH PROVINCE |
title_full_unstemmed |
FLOOD CONTROL CONSTRUCTION PLANNING IN TAMIANG WATERSHED, ACEH PROVINCE |
title_sort |
flood control construction planning in tamiang watershed, aceh province |
url |
https://digilib.itb.ac.id/gdl/view/48004 |
_version_ |
1822000000699203584 |