FLOOD CONTROL CONSTRUCTION PLANNING IN TAMIANG WATERSHED, ACEH PROVINCE

To overcome the problem of annual floods and flash floods that occur in the Tamiang watershed, Aceh Province, especially in Aceh Tamiang District, it is necessary to plan the construction of flood control in order to overcome floods problem that can be completed or can be reduced, so that they ca...

Full description

Saved in:
Bibliographic Details
Main Author: Hambali, Ahmad
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/48004
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first