ANALISIS TWO TANK STORAGE PADA PEMBANGKIT LISTRIK TENAGA SURYA BERBASIS THERMAL DI INDONESIA
The increase in population results in an increase in energy demand, especially electricity. Indonesia is a country with considerable solar irradiation potential, especially in South Central Timor regency, East Nusa Tenggara which has a high level of solar irradiation that can be above 5 kWh/m2/day....
Saved in:
Main Author: | Azka, Muhammad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/48055 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
MULTI KRITERIA ANALISIS UNTUK PENENTUAN WILAYAH POTENSIAL PEMASANGAN PEMBANGKIT LISTRIK TENAGA SURYA(PLTS) ATAP DI KOTA BANDUNG
by: Titon Nur Ihsan, Kalingga -
PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CILEUNCA, PENGALENGAN, JAWA BARAT
by: Rifqi Asyraf Wardono, Muhammad -
JARINGAN SYARAF TIRUAN SEBAGAI PENGENDALI ADAPTIF PADA MODEL PEMBANGKIT LISTRIK TENAGA UAP
by: Lanny Widyastuti Pandjaitan, M.M. -
PEMANFAATAN RESONANSI GELOMBANG UNTUK PEMBANGKIT ENERGI LISTRIK
by: Hasan Achmad, Nur -
PERANCANGAN SISTEM PERPIPAAN PADA PEMBANGKIT LISTRIK TENAGA PANAS BUMI (STUDI KASUS: PLTP UNIT IV LAHENDONG KLUSTER 24)
by: Pradipta, Irfan