PERANCANGAN ASPEK MANAJEMEN KONSTRUKSI BREAKWATER DAN DERMAGA TAHAP IB DI MAKASSAR NEW PORT
Makassar New Port is a container port built in Makassar, South Sulawesi. Construction of a 1, 375meter long breakwater was carried out on the IA stage. The breakwater is built to protect the harbor pool from large waves so that the loading and unloading process can run safely. In addition to breakwa...
Saved in:
Main Author: | Anindita Senaya, Michell |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/48056 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESAIN OPERASIONAL TERMINAL PETI KEMAS MAKASSAR NEW PORT TAHAP I PT. PELABUHAN INDONESIA IV
by: Utami Manullang, Maria -
PERANCANGAN STRUKTUR DERMAGA PETI KEMAS DI PELABUHAN KUALA TANJUNG, PROVINSI SUMATERA UTARA
by: Joseph Martin, Reinard -
PERENCANAAN STRUKTUR DERMAGA CAR TERMINAL TIPE DECK ON PILE PADA PELABUHAN PATIMBAN, SUBANG, PROVINSI JAWA BARAT, TAHAP 1, FASE 2
by: Avila, David -
STRUCTURAL DESIGN OF CONTAINER BERTH AT MAKASSAR NEW PORT PHASE 1B, MAKASSAR CITY, SOUTH OF SULAWESI
by: Tapian B. Nainggolan, Lawrensqy -
PERENCANAAN LAYOUT PENGEMBANGAN PELABUHAN PETI KEMAS MAKASSAR NEW PORT
by: Netanya, Dionisius