ALOKASI STASIUN KERJA INSPEKSI PADA SISTEM MANUFAKTUR
<b>Abstract :</b><p align="justify"> <br /> <br /> <br /> By planning Allocation inspection stations in serial and nonserial multistage manufacturing system, the number of nonconform products in the market can be reduced. Then quality cost can .be m...
Saved in:
Main Author: | Hamzah , Moh. |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/4809 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
EVALUASI KEBIJAKAN KREDIT MODAL KERJA TERHADAP KINERJA PERKREDITAN DI BANK CTR
by: Hariss , Losade -
PERILAKU KERJA DOKTER YANG BEKERJA DI RUMAH SAKIT DI WILAYAH KABUPATEN DAN KOTAMADYA BANDUNG
by: Suhardiman MA., H. -
PENERAPAN METODA INFORMATION ECONOMICS UNTUK MENGUKUR NILAI EKONOMI IMPLEMENTASI SISTEM LAYANAN KEUANGAN PT POS INDONESIA
by: , Sudjanarko -
ANALISIS SISTEM DAN PROSEDUR PENGENDALIAN DALAM AKTIVITAS PEMBELIAN DAN PENJUALAN BARANG DAGANGAN DI PD. ANEKA KIMIA, BANDUNG
by: Wijaya, Franky -
TINJAUAN SISTEM MANAJEMEN PENGEMBANGAN ORANG DALAM KAITANNYA DENGAN UPAYA PERUBAHAN MENUJU KEPEMIMPINAN TRANSFORMASIONAL KASUS: PT.KALTEX PACIFIC INDONESIA
by: Permana, Iman