ALOKASI STASIUN KERJA INSPEKSI PADA SISTEM MANUFAKTUR
<b>Abstract :</b><p align="justify"> <br /> <br /> <br /> By planning Allocation inspection stations in serial and nonserial multistage manufacturing system, the number of nonconform products in the market can be reduced. Then quality cost can .be m...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/4809 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!