ALOKASI STASIUN KERJA INSPEKSI PADA SISTEM MANUFAKTUR

<b>Abstract :</b><p align=\"justify\">By planning Allocation inspection stations in serial and nonserial multistage manufacturing system, the number of nonconform products in the market can be reduced. Then quality cost can be minimized. The reducing of a number of concon...

Full description

Saved in:
Bibliographic Details
Main Author: Hamzah, Moh.
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/4810
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:4810
spelling id-itb.:48102006-06-13T11:41:08ZALOKASI STASIUN KERJA INSPEKSI PADA SISTEM MANUFAKTUR Hamzah, Moh. Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/4810 <b>Abstract :</b><p align=\"justify\">By planning Allocation inspection stations in serial and nonserial multistage manufacturing system, the number of nonconform products in the market can be reduced. Then quality cost can be minimized. The reducing of a number of conconform products under warranty policy is subjected to minimize warranty cost. In this research, the warranty policy is Free Replacement Warranty with replacement and minimal repair case. <br /> <br /> The problem of allocation inspection stations in serial and nonserial multistage manufacturing system with its the policy warranty can be approached by simulated annealing algorithm Therefore its number and configuration of inspection stasions which will get the maximum profit is known. <br /> <br /> With Weibull distribution function, where the characteristics of conform product, F<sub>1</sub>(W==1) is 0.1241 and nonconform product, F<sub>2</sub>(W=1) is 0.4113 can be known number of replacement is 0.1271 and the maximum profit is 88.24 in serial multistage manufacturing system and number of station is one in stage one of six serial manufacturing stages. In nonserial multistage manufacturing system, number of replacement is 0.1270 will get the profit is 87.924, and 100.92 with number of minimal repair is 0.1326. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Hamzah, Moh.
ALOKASI STASIUN KERJA INSPEKSI PADA SISTEM MANUFAKTUR
description <b>Abstract :</b><p align=\"justify\">By planning Allocation inspection stations in serial and nonserial multistage manufacturing system, the number of nonconform products in the market can be reduced. Then quality cost can be minimized. The reducing of a number of conconform products under warranty policy is subjected to minimize warranty cost. In this research, the warranty policy is Free Replacement Warranty with replacement and minimal repair case. <br /> <br /> The problem of allocation inspection stations in serial and nonserial multistage manufacturing system with its the policy warranty can be approached by simulated annealing algorithm Therefore its number and configuration of inspection stasions which will get the maximum profit is known. <br /> <br /> With Weibull distribution function, where the characteristics of conform product, F<sub>1</sub>(W==1) is 0.1241 and nonconform product, F<sub>2</sub>(W=1) is 0.4113 can be known number of replacement is 0.1271 and the maximum profit is 88.24 in serial multistage manufacturing system and number of station is one in stage one of six serial manufacturing stages. In nonserial multistage manufacturing system, number of replacement is 0.1270 will get the profit is 87.924, and 100.92 with number of minimal repair is 0.1326.
format Theses
author Hamzah, Moh.
author_facet Hamzah, Moh.
author_sort Hamzah, Moh.
title ALOKASI STASIUN KERJA INSPEKSI PADA SISTEM MANUFAKTUR
title_short ALOKASI STASIUN KERJA INSPEKSI PADA SISTEM MANUFAKTUR
title_full ALOKASI STASIUN KERJA INSPEKSI PADA SISTEM MANUFAKTUR
title_fullStr ALOKASI STASIUN KERJA INSPEKSI PADA SISTEM MANUFAKTUR
title_full_unstemmed ALOKASI STASIUN KERJA INSPEKSI PADA SISTEM MANUFAKTUR
title_sort alokasi stasiun kerja inspeksi pada sistem manufaktur
url https://digilib.itb.ac.id/gdl/view/4810
_version_ 1820663502947221504