RISK ANALYSIS OF COST OVERRUN IN DAM CONSTRUCTION PROJECT DUE TO CHANGE ORDER
Risks and uncertainties can be a factor in the failure of construction projects to achieve their stated goals. There are seven risk events that often occur in construction projects, one of them is the provision of additional or less work, which is called a change order. Based on preliminary data...
Saved in:
Main Author: | Sella Fajar, Sandy |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/48131 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
COST RISK ANALYSIS OF ROAD CONSTRUCTION PROJECT IN SOUTHEAST SULAWESI PROVINCE INDONESIA
by: Rusdian La Ola, Muhammad -
OPTIMAL COST ANALYSIS FOR PROJECT SCHEDULE ACCELERATION (CASE STUDY: MOTHER AND CHILD HOSPITAL CONSTRUCTION PROJECT OF DR. HASAN SADIKIN BANDUNG)
by: Rizki Khairi, Fajar -
ANALYSIS THE CORRELATION OF THE IMPLEMENTATION OF BUILDING INFORMATION MODELING (BIM) ON COST AND TIME PERFORMANCE OF CONSTRUCTION PROJECTS
by: Hanif Hafizhuddin, Wildan -
CONSTRUCTION MANAGEMENT DESIGN OF THE SURUMANA DAM â SULAWESI TENGAH
by: Noer Setyawan, Afif -
COST AND SCHEDULE RISK ANALYSIS FOR THE JAKARTA-BANDUNG HIGH SPEED RAILWAY SUBSECTION 3D PROJECT FROM THE PERSPECTIVE OF AN INDONESIAN CONTRACTOR
by: Raishania Amarin Gata, Tasya