DEVELOPMENT OF HEURISTIC SCHEDULING METHODE FOR FINAL ASSEMBLY AREA BASED ON SPLITTING AND CRASHING APPROACHES

The air craft final assembly process is different from the general product assembly process. In the product assembly process in general, components will move through several work stations on the assembly line. However, at the final assembly of the aircraft, the sub-assembly components will be collec...

Full description

Saved in:
Bibliographic Details
Main Author: Rozy Abdul Azis, Fahrul
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/48206
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia