DEVELOPMENT OF HEURISTIC SCHEDULING METHODE FOR FINAL ASSEMBLY AREA BASED ON SPLITTING AND CRASHING APPROACHES
The air craft final assembly process is different from the general product assembly process. In the product assembly process in general, components will move through several work stations on the assembly line. However, at the final assembly of the aircraft, the sub-assembly components will be collec...
Saved in:
Main Author: | Rozy Abdul Azis, Fahrul |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/48206 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS OF THE EFFECT OF ADDITION OF CUSHION ON BUS PASSENGER HEAD INJURY ON FRONTAL CRASH
by: Setiawan, Jerry -
CRASHWORTHINESS ANALYSIS OF CRASH BOX STRUCTURE USING NATURAL FIBER HYBRID COMPOSITE
by: Amanda, Silvia -
OPTIMIZATION OF BIOMIMETIC CRASH BOX STRUCTURE USING DESIGN FOR SIX SIGMA METHOD
by: Lucky Natalio, Anggi -
NUMERICAL SIMULATION AND OPTIMIZATION OF MULTI-CELL HEXAGONAL CRASH BOX STRUCTURE UNDER AXIAL LOADING
by: Hayu Jarwadi, Maulana -
NUMERICAL AND EXPERIMENTAL ANALYSIS OF DOUBLE-HAT MULTI-CORNER CRASH BOX SUBJECTED TO AXIAL IMPACT FORCE
by: Adi Kusnanda, Muhammad