PERANCANGAN PENUGASAN PEKERJA PADA LINTAS PERAKITAN PANELISASI REAR FUSELAGE PESAWAT CN-295 PT DIRGANTARA INDONESIA

PT Dirgantara Indonesia (PT DI) is a State-Owned Enterprise which working in the airplane and helicopter production. One of the best products from PT DI is the CN-295. CN-295 has demand level of 4 units per year or desired cycle time of 3 months. PT DI cannot reach the demand level for CN-295 becau...

Full description

Saved in:
Bibliographic Details
Main Author: Fauzie, Eduardi
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/48403
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:48403
spelling id-itb.:484032020-06-29T09:02:55ZPERANCANGAN PENUGASAN PEKERJA PADA LINTAS PERAKITAN PANELISASI REAR FUSELAGE PESAWAT CN-295 PT DIRGANTARA INDONESIA Fauzie, Eduardi Indonesia Final Project operator assignment, mixed integer linear programming, assembly line INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/48403 PT Dirgantara Indonesia (PT DI) is a State-Owned Enterprise which working in the airplane and helicopter production. One of the best products from PT DI is the CN-295. CN-295 has demand level of 4 units per year or desired cycle time of 3 months. PT DI cannot reach the demand level for CN-295 because current production level is 3 units per year or cycle time is 4 months. PT DI not able to meet CN-295 demand because PT DI hasn’t used any operator assignment methods that can provide detailed allocation of operations for each operator. Operator assignment is done based on supervisor’s intuition. Therefore, this study was conducted to determine the method of operator assignments that minimize cycle time. The mixed integer linear programming model is used as a model for operator assignments in the CN-295 assembly line. The objective function of this model is to minimize assembly cycle time with constraints of skills of operator, precedence constraint, and assembly process. Output of this model is operations assignment to the operator and operations schedule. Computation is done using IBM ILOG CPLEX Optimization Studio 12.9.0. Computational results show that there is no change in the number of operators needed across the assembly line. Cycle time of operator assignment method meet desired cycle time of 3 months. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT Dirgantara Indonesia (PT DI) is a State-Owned Enterprise which working in the airplane and helicopter production. One of the best products from PT DI is the CN-295. CN-295 has demand level of 4 units per year or desired cycle time of 3 months. PT DI cannot reach the demand level for CN-295 because current production level is 3 units per year or cycle time is 4 months. PT DI not able to meet CN-295 demand because PT DI hasn’t used any operator assignment methods that can provide detailed allocation of operations for each operator. Operator assignment is done based on supervisor’s intuition. Therefore, this study was conducted to determine the method of operator assignments that minimize cycle time. The mixed integer linear programming model is used as a model for operator assignments in the CN-295 assembly line. The objective function of this model is to minimize assembly cycle time with constraints of skills of operator, precedence constraint, and assembly process. Output of this model is operations assignment to the operator and operations schedule. Computation is done using IBM ILOG CPLEX Optimization Studio 12.9.0. Computational results show that there is no change in the number of operators needed across the assembly line. Cycle time of operator assignment method meet desired cycle time of 3 months.
format Final Project
author Fauzie, Eduardi
spellingShingle Fauzie, Eduardi
PERANCANGAN PENUGASAN PEKERJA PADA LINTAS PERAKITAN PANELISASI REAR FUSELAGE PESAWAT CN-295 PT DIRGANTARA INDONESIA
author_facet Fauzie, Eduardi
author_sort Fauzie, Eduardi
title PERANCANGAN PENUGASAN PEKERJA PADA LINTAS PERAKITAN PANELISASI REAR FUSELAGE PESAWAT CN-295 PT DIRGANTARA INDONESIA
title_short PERANCANGAN PENUGASAN PEKERJA PADA LINTAS PERAKITAN PANELISASI REAR FUSELAGE PESAWAT CN-295 PT DIRGANTARA INDONESIA
title_full PERANCANGAN PENUGASAN PEKERJA PADA LINTAS PERAKITAN PANELISASI REAR FUSELAGE PESAWAT CN-295 PT DIRGANTARA INDONESIA
title_fullStr PERANCANGAN PENUGASAN PEKERJA PADA LINTAS PERAKITAN PANELISASI REAR FUSELAGE PESAWAT CN-295 PT DIRGANTARA INDONESIA
title_full_unstemmed PERANCANGAN PENUGASAN PEKERJA PADA LINTAS PERAKITAN PANELISASI REAR FUSELAGE PESAWAT CN-295 PT DIRGANTARA INDONESIA
title_sort perancangan penugasan pekerja pada lintas perakitan panelisasi rear fuselage pesawat cn-295 pt dirgantara indonesia
url https://digilib.itb.ac.id/gdl/view/48403
_version_ 1822927911451099136