DAMPAK PEMBANGUNAN PLTU UNIT II CIREBON TERHADAP KONDISI SOSIAL EKONOMI MASYARAKAT DESA KANCI DAN DESA WARUDUWUR KABUPATEN CIREBON

In the Cirebon District Regional Spatial Plan for 2011-202 there are additional electricity generator in Cirebon Regency. The government's commitment through the plan has been implemented at the end of 2018, namely the construction of the Phase II Cirebon Steam Power Plant (PLTU) capacity of 1X...

Full description

Saved in:
Bibliographic Details
Main Author: Sherlistia, Mentari
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/48760
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:48760
spelling id-itb.:487602020-07-01T12:33:31ZDAMPAK PEMBANGUNAN PLTU UNIT II CIREBON TERHADAP KONDISI SOSIAL EKONOMI MASYARAKAT DESA KANCI DAN DESA WARUDUWUR KABUPATEN CIREBON Sherlistia, Mentari Indonesia Final Project Steam Power Plant (PLTU) Phase II Cirebon,Socio-economic, the construction of the power plant, Kanci Village and Kandawaru Blocks. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/48760 In the Cirebon District Regional Spatial Plan for 2011-202 there are additional electricity generator in Cirebon Regency. The government's commitment through the plan has been implemented at the end of 2018, namely the construction of the Phase II Cirebon Steam Power Plant (PLTU) capacity of 1X1000 Mw which is located in Kanci Village, Astanajapura District and Kandawaru Block, Waruduwur Village, Mundu District. This study aims to analyze the impact of the construction of the Cirebon Unit II PLTU on the socio-economic community of the Kanci Village and the Kandawaru Block Waruduwur Village which are the main locations of the Cirebon Unit II PLTU. This research will use the primary data collection method and the main method is quantitative with several units of analysis using statistical descriptive analysis, Wilcoxon Sign Rank Test analysis and qualitative analysis of the results of interviews as support. This study will dig deeper into the characteristics of the Kanci Village and the Kandawaru Block, identify participation, perspectives, aspirations, expectations of the people of the Kanci Village and the Kandawaru Block, and analyze the impacts after the construction of the Cirebon Unit II PLTU. This study found a difference in the impact felt by the Kanci Village and the Kandawaru Block due to the influence of the location. Kanci Village has a large area with more diverse types of community work than the Kandawaru Block and the water quality of Kanci Village is worse than the Kandawaru Block. This explains that the location aspect influences the socioeconomic impact of the area affected by PLTU development. Although overall the construction of the power plant to the construction stage has quite a positive impact on the study area. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description In the Cirebon District Regional Spatial Plan for 2011-202 there are additional electricity generator in Cirebon Regency. The government's commitment through the plan has been implemented at the end of 2018, namely the construction of the Phase II Cirebon Steam Power Plant (PLTU) capacity of 1X1000 Mw which is located in Kanci Village, Astanajapura District and Kandawaru Block, Waruduwur Village, Mundu District. This study aims to analyze the impact of the construction of the Cirebon Unit II PLTU on the socio-economic community of the Kanci Village and the Kandawaru Block Waruduwur Village which are the main locations of the Cirebon Unit II PLTU. This research will use the primary data collection method and the main method is quantitative with several units of analysis using statistical descriptive analysis, Wilcoxon Sign Rank Test analysis and qualitative analysis of the results of interviews as support. This study will dig deeper into the characteristics of the Kanci Village and the Kandawaru Block, identify participation, perspectives, aspirations, expectations of the people of the Kanci Village and the Kandawaru Block, and analyze the impacts after the construction of the Cirebon Unit II PLTU. This study found a difference in the impact felt by the Kanci Village and the Kandawaru Block due to the influence of the location. Kanci Village has a large area with more diverse types of community work than the Kandawaru Block and the water quality of Kanci Village is worse than the Kandawaru Block. This explains that the location aspect influences the socioeconomic impact of the area affected by PLTU development. Although overall the construction of the power plant to the construction stage has quite a positive impact on the study area.
format Final Project
author Sherlistia, Mentari
spellingShingle Sherlistia, Mentari
DAMPAK PEMBANGUNAN PLTU UNIT II CIREBON TERHADAP KONDISI SOSIAL EKONOMI MASYARAKAT DESA KANCI DAN DESA WARUDUWUR KABUPATEN CIREBON
author_facet Sherlistia, Mentari
author_sort Sherlistia, Mentari
title DAMPAK PEMBANGUNAN PLTU UNIT II CIREBON TERHADAP KONDISI SOSIAL EKONOMI MASYARAKAT DESA KANCI DAN DESA WARUDUWUR KABUPATEN CIREBON
title_short DAMPAK PEMBANGUNAN PLTU UNIT II CIREBON TERHADAP KONDISI SOSIAL EKONOMI MASYARAKAT DESA KANCI DAN DESA WARUDUWUR KABUPATEN CIREBON
title_full DAMPAK PEMBANGUNAN PLTU UNIT II CIREBON TERHADAP KONDISI SOSIAL EKONOMI MASYARAKAT DESA KANCI DAN DESA WARUDUWUR KABUPATEN CIREBON
title_fullStr DAMPAK PEMBANGUNAN PLTU UNIT II CIREBON TERHADAP KONDISI SOSIAL EKONOMI MASYARAKAT DESA KANCI DAN DESA WARUDUWUR KABUPATEN CIREBON
title_full_unstemmed DAMPAK PEMBANGUNAN PLTU UNIT II CIREBON TERHADAP KONDISI SOSIAL EKONOMI MASYARAKAT DESA KANCI DAN DESA WARUDUWUR KABUPATEN CIREBON
title_sort dampak pembangunan pltu unit ii cirebon terhadap kondisi sosial ekonomi masyarakat desa kanci dan desa waruduwur kabupaten cirebon
url https://digilib.itb.ac.id/gdl/view/48760
_version_ 1822928008466399232