INVESTIGATING BREAKING LOAD AND FATIGUE LIFE OF NUT ELEVATOR CONVEYOR CHAINS IN EAST OIL MILL
In the East Oil Mill, there are several vertical conveyor system, where one of them is TRP-A8H conveyor. In this conveyor system, design conditions including the minimum breaking load and safety factor are vital. Additionally, it is also necessary to analyze fatigue failures due to interference f...
Saved in:
Main Author: | Husna Qadirah Binti Zulhas, Nur |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/49055 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DEVELOPMENT OF BELT CONVEYOR, SCREW CONVEYOR, AND BUCKET CONVEYOR CALCULATION PROGRAM
by: SUDIRO (NIM : 13105109); Pembimbing Utama : Prof. Dr. Ir. Indra Nurhadi, BAGUS -
Development of Belt Conveyor, Screw Conveyor, and Bucket Conveyor Calculation Program
by: Sudiro, Bagus -
Implementation of Multi-Body Dynamics Simulation for the Conveyor Chain Drive System
by: Chakrit Suvanjumrat, et al.
Published: (2018) -
INVESTMENT PROJECT ANALYSIS OF IN-LOADING CONVEYOR CASE STUDY OF PT. XYZ
by: Fahmi Artadi, Rudy -
Report on belt conveyors.
by: Soliven, Regulo V.
Published: (1955)