CONSTRUCTION ENGINEERING MANAGEMENT OF JOYOBOYO INTERMODAL STATION, SURABAYA

Surabaya is the capital of the Indonesian province of East Java with a population of 3.094.732 which grows 0.65% every year resulting the traffic to be densed. Therefore, Joyoboyo Intermodal Station designed as a mass transportation solution that integrated with another transportation mode. For the...

Full description

Saved in:
Bibliographic Details
Main Author: Adi Maruli Siahaan, Abraham
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/49400
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:49400
spelling id-itb.:494002020-09-16T09:58:18ZCONSTRUCTION ENGINEERING MANAGEMENT OF JOYOBOYO INTERMODAL STATION, SURABAYA Adi Maruli Siahaan, Abraham Indonesia Final Project Joyoboyo Intermodal Station, construction execution method, scheduling, construction cost estimation INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/49400 Surabaya is the capital of the Indonesian province of East Java with a population of 3.094.732 which grows 0.65% every year resulting the traffic to be densed. Therefore, Joyoboyo Intermodal Station designed as a mass transportation solution that integrated with another transportation mode. For the project realization, construction engineering management consisting of construction execution method, scheduling, and construction cost estimation is necessary. Construction method in the project started with preparatory work consisting of field clearing, measuring & referencing, and temporary facility construction. Next, lower structure work consisting of foundation and retaining wall work. Upper structure work consisting of column, beam, and slab work for 4 stories and ended with steel truss roof work. Further, there are transportation and drainage work. The task dependency in this project is combination of start-start and finish-start dependency. Total duration for the project is 636 days which start on 1 August 2020 and finish on 29 April 2022. The project estimated to cost Rp75,621,094,468.54 covering direct cost and indirect cost composed of quality control cost, BPJS Ketenagakerjaan cost, tax cost, overhead cost, contingency cost, and profit. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Surabaya is the capital of the Indonesian province of East Java with a population of 3.094.732 which grows 0.65% every year resulting the traffic to be densed. Therefore, Joyoboyo Intermodal Station designed as a mass transportation solution that integrated with another transportation mode. For the project realization, construction engineering management consisting of construction execution method, scheduling, and construction cost estimation is necessary. Construction method in the project started with preparatory work consisting of field clearing, measuring & referencing, and temporary facility construction. Next, lower structure work consisting of foundation and retaining wall work. Upper structure work consisting of column, beam, and slab work for 4 stories and ended with steel truss roof work. Further, there are transportation and drainage work. The task dependency in this project is combination of start-start and finish-start dependency. Total duration for the project is 636 days which start on 1 August 2020 and finish on 29 April 2022. The project estimated to cost Rp75,621,094,468.54 covering direct cost and indirect cost composed of quality control cost, BPJS Ketenagakerjaan cost, tax cost, overhead cost, contingency cost, and profit.
format Final Project
author Adi Maruli Siahaan, Abraham
spellingShingle Adi Maruli Siahaan, Abraham
CONSTRUCTION ENGINEERING MANAGEMENT OF JOYOBOYO INTERMODAL STATION, SURABAYA
author_facet Adi Maruli Siahaan, Abraham
author_sort Adi Maruli Siahaan, Abraham
title CONSTRUCTION ENGINEERING MANAGEMENT OF JOYOBOYO INTERMODAL STATION, SURABAYA
title_short CONSTRUCTION ENGINEERING MANAGEMENT OF JOYOBOYO INTERMODAL STATION, SURABAYA
title_full CONSTRUCTION ENGINEERING MANAGEMENT OF JOYOBOYO INTERMODAL STATION, SURABAYA
title_fullStr CONSTRUCTION ENGINEERING MANAGEMENT OF JOYOBOYO INTERMODAL STATION, SURABAYA
title_full_unstemmed CONSTRUCTION ENGINEERING MANAGEMENT OF JOYOBOYO INTERMODAL STATION, SURABAYA
title_sort construction engineering management of joyoboyo intermodal station, surabaya
url https://digilib.itb.ac.id/gdl/view/49400
_version_ 1822928178672304128