ALGORITMA PENJADWALAN ULANG PADA INDUSTRI KIMIA PROCESS BATCH SPACE 1 DAN SPACE 2

<b></i>Abstrak :</b><i><p align=\"justify\"> <br /> Short term scheduling of batch process chemical production system is a vital issues because of its dynamic behaviour, process variability and complexities. Scheduling system in discrete type production...

Full description

Saved in:
Bibliographic Details
Main Author: Hartini, Sri
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/4995
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:4995
spelling id-itb.:49952006-05-18T11:45:22ZALGORITMA PENJADWALAN ULANG PADA INDUSTRI KIMIA PROCESS BATCH SPACE 1 DAN SPACE 2 Hartini, Sri Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Theses Management, production, algorithm INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/4995 <b></i>Abstrak :</b><i><p align=\"justify\"> <br /> Short term scheduling of batch process chemical production system is a vital issues because of its dynamic behaviour, process variability and complexities. Scheduling system in discrete type production system cannot apply directly to batch process, because of the specific characteristic. Batch process management, therefore, requires a new on-line scheduling framework based on the characteristic of batch process.<p align=\"justify\"> <br /> Batch chemical plants are classified into two categories : multiproduct and multipurpose. In multiproduct plant, all products follow essentially the same sequence of processing step. In multipurpose plant, the products may follow different paths through the plant [Ku et al, 1987].<p align=\"justify\"> <br /> Ishii and Muraki (1997) developed a generic framework for on-line scheduling and control system (FOSS) in batch process management, which proposed three spaces of rescheduling action, which ar : space 1 : modification in the task start and completion times, space 2 :modifi cation of resource assignment without changing the production sequence, and space 3 : change the production sequence. But FOSS has not been developed a detail algorithm, thus FOSS need a detail algorithm for each space.<p align=\"justify\"> <br /> This research proposes algorithm for space 1 and space 2. in multiproduct batch prosess based on the ON of disruption occurred, i.e.: processing time variation, changes of unit availability and operator availability. Developing of the algorithm considered type of waiting time contrains, Zero wait (ZW) and UW (Unlimited Wait) text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Hartini, Sri
ALGORITMA PENJADWALAN ULANG PADA INDUSTRI KIMIA PROCESS BATCH SPACE 1 DAN SPACE 2
description <b></i>Abstrak :</b><i><p align=\"justify\"> <br /> Short term scheduling of batch process chemical production system is a vital issues because of its dynamic behaviour, process variability and complexities. Scheduling system in discrete type production system cannot apply directly to batch process, because of the specific characteristic. Batch process management, therefore, requires a new on-line scheduling framework based on the characteristic of batch process.<p align=\"justify\"> <br /> Batch chemical plants are classified into two categories : multiproduct and multipurpose. In multiproduct plant, all products follow essentially the same sequence of processing step. In multipurpose plant, the products may follow different paths through the plant [Ku et al, 1987].<p align=\"justify\"> <br /> Ishii and Muraki (1997) developed a generic framework for on-line scheduling and control system (FOSS) in batch process management, which proposed three spaces of rescheduling action, which ar : space 1 : modification in the task start and completion times, space 2 :modifi cation of resource assignment without changing the production sequence, and space 3 : change the production sequence. But FOSS has not been developed a detail algorithm, thus FOSS need a detail algorithm for each space.<p align=\"justify\"> <br /> This research proposes algorithm for space 1 and space 2. in multiproduct batch prosess based on the ON of disruption occurred, i.e.: processing time variation, changes of unit availability and operator availability. Developing of the algorithm considered type of waiting time contrains, Zero wait (ZW) and UW (Unlimited Wait)
format Theses
author Hartini, Sri
author_facet Hartini, Sri
author_sort Hartini, Sri
title ALGORITMA PENJADWALAN ULANG PADA INDUSTRI KIMIA PROCESS BATCH SPACE 1 DAN SPACE 2
title_short ALGORITMA PENJADWALAN ULANG PADA INDUSTRI KIMIA PROCESS BATCH SPACE 1 DAN SPACE 2
title_full ALGORITMA PENJADWALAN ULANG PADA INDUSTRI KIMIA PROCESS BATCH SPACE 1 DAN SPACE 2
title_fullStr ALGORITMA PENJADWALAN ULANG PADA INDUSTRI KIMIA PROCESS BATCH SPACE 1 DAN SPACE 2
title_full_unstemmed ALGORITMA PENJADWALAN ULANG PADA INDUSTRI KIMIA PROCESS BATCH SPACE 1 DAN SPACE 2
title_sort algoritma penjadwalan ulang pada industri kimia process batch space 1 dan space 2
url https://digilib.itb.ac.id/gdl/view/4995
_version_ 1820663556177133568