ALGORITMA PENJADWALAN ULANG PADA INDUSTRI KIMIA PROCESS BATCH SPACE 1 DAN SPACE 2
<b></i>Abstrak :</b><i><p align=\"justify\"> <br /> Short term scheduling of batch process chemical production system is a vital issues because of its dynamic behaviour, process variability and complexities. Scheduling system in discrete type production...
Saved in:
Main Author: | Hartini, Sri |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/4995 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PENGEMBANGAN ALGORITMA PENJADWALAN DAN PENJADWALAN ULANG DENGAN MEKANISME PAKSA PADA MESIN DAN JOB
by: Muluk , Asmuliardi -
PENGEMBANGAN ALGORITMA SOLUSI ALTERNATIF MINIMUM SPANNING TREE DART KOMBINASI ALGORITMA PRIM DAN ALJABAR GONDRAN
by: Ahmad, Shalahuddin -
STABILISASI TANAH SEMEN DAN KIMIA PADA TANAH LEMPUNG BANDUNG
by: Sri Lestari, Anastasia -
STUDI EKSPERIMIENTAL PERILAKU PELAT BETON AGREGAT DAUR ULANG DIBAWAH BEBAN STATIK
by: Afmi (NIM : 25000013), Zul -
ANALYSIS OF THE IMPACT OF HIDROLOGICAL SPACE <BR />FUNCTION CHANGE ON WATER BALANCE <BR />CASE OF CEKUNGAN BANDUNG
by: Widiati (NIM : 25395012), Ati