DESIGN AND ANALYSIS OF 20 KWP HYBRID SOLAR POWER PLANT (PLTS) AS SERVER SPACE ENERGY SUPPLY IN LABTEK VI BUILDING
Labtek VI Building, Bandung Institute of Technology is implementing a smart building system, a building that can manage resources efficiently and environmentally friendly by utilizing new and renewable energy. In addition, the need for electrical energy still relies on fossil fuels sourced from the...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/62483 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |