DESIGN AND ANALYSIS OF 20 KWP HYBRID SOLAR POWER PLANT (PLTS) AS SERVER SPACE ENERGY SUPPLY IN LABTEK VI BUILDING

Labtek VI Building, Bandung Institute of Technology is implementing a smart building system, a building that can manage resources efficiently and environmentally friendly by utilizing new and renewable energy. In addition, the need for electrical energy still relies on fossil fuels sourced from the...

Full description

Saved in:
Bibliographic Details
Main Author: Avennathan Rezavidi, Fakhrizal
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/62483
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first