RANCANGAN PENUGASAN OPERATOR PADA STASIUN KERJA 3 DIVISI FINAL ASSEMBLY LINE UNTUK PESAWAT NC-212I PT DIRGANTARA INDONESIA

PT Dirgantara Indonesia (PT DI) is a state-owned enterprise (BUMN) engaged in the production of aircraft and helicopters. One product of PT DI is a NC-212i aircraft. The NC-212i has a demand of 6 units per year. PT DI was unable to fulfill the demand of the NC-212i due to the current production rate...

Full description

Saved in:
Bibliographic Details
Main Author: Hamid, Fyrlia
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/50235
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:50235
spelling id-itb.:502352020-09-23T10:01:10ZRANCANGAN PENUGASAN OPERATOR PADA STASIUN KERJA 3 DIVISI FINAL ASSEMBLY LINE UNTUK PESAWAT NC-212I PT DIRGANTARA INDONESIA Hamid, Fyrlia Indonesia Final Project assignment operator, heuristic method, assembly line INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/50235 PT Dirgantara Indonesia (PT DI) is a state-owned enterprise (BUMN) engaged in the production of aircraft and helicopters. One product of PT DI is a NC-212i aircraft. The NC-212i has a demand of 6 units per year. PT DI was unable to fulfill the demand of the NC-212i due to the current production rate of 4 units per year. This then makes the FAL division of PT DI doing a change of station design from fixed layout to product layout with 3 workstations, where each workstation has a station time for 2 months, so demand 6 units of NC-212i per year can be fulfilled. With the change in the number of workstations used by NC-212i in the FAL division, PT DI requires the method of assignment of operators consisting of mathematical models and completion algorithms so as to provide the allocation of operations to each operator in detail for each workstation which then becomes the design of the operator's assignment for the new design of the workstation. Previous operator assignments were conducted based on intuition from the assembly supervisor. Therefore, this study was conducted to determine the plan of operator assignment that minimizes the number of operators required. The plan for the assignment of the operator for the 3-station NC-212i of FAL PT Division was conducted using the heuristic method. The method has objective function to minimize operator requirement and the constraints are operator’s skill, precedence constraint, and operation’s start time. The output generated from this model is to provide operations assignment results on operators and operating schedules. The heuristic method shows the solution to the needs of the operator on the workstation 3 is 19 operators with a desired station time of 38.67 days or 309.26 hours. By implementing this solution, the production target for demand as many as 6 units/per year can be achieved. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT Dirgantara Indonesia (PT DI) is a state-owned enterprise (BUMN) engaged in the production of aircraft and helicopters. One product of PT DI is a NC-212i aircraft. The NC-212i has a demand of 6 units per year. PT DI was unable to fulfill the demand of the NC-212i due to the current production rate of 4 units per year. This then makes the FAL division of PT DI doing a change of station design from fixed layout to product layout with 3 workstations, where each workstation has a station time for 2 months, so demand 6 units of NC-212i per year can be fulfilled. With the change in the number of workstations used by NC-212i in the FAL division, PT DI requires the method of assignment of operators consisting of mathematical models and completion algorithms so as to provide the allocation of operations to each operator in detail for each workstation which then becomes the design of the operator's assignment for the new design of the workstation. Previous operator assignments were conducted based on intuition from the assembly supervisor. Therefore, this study was conducted to determine the plan of operator assignment that minimizes the number of operators required. The plan for the assignment of the operator for the 3-station NC-212i of FAL PT Division was conducted using the heuristic method. The method has objective function to minimize operator requirement and the constraints are operator’s skill, precedence constraint, and operation’s start time. The output generated from this model is to provide operations assignment results on operators and operating schedules. The heuristic method shows the solution to the needs of the operator on the workstation 3 is 19 operators with a desired station time of 38.67 days or 309.26 hours. By implementing this solution, the production target for demand as many as 6 units/per year can be achieved.
format Final Project
author Hamid, Fyrlia
spellingShingle Hamid, Fyrlia
RANCANGAN PENUGASAN OPERATOR PADA STASIUN KERJA 3 DIVISI FINAL ASSEMBLY LINE UNTUK PESAWAT NC-212I PT DIRGANTARA INDONESIA
author_facet Hamid, Fyrlia
author_sort Hamid, Fyrlia
title RANCANGAN PENUGASAN OPERATOR PADA STASIUN KERJA 3 DIVISI FINAL ASSEMBLY LINE UNTUK PESAWAT NC-212I PT DIRGANTARA INDONESIA
title_short RANCANGAN PENUGASAN OPERATOR PADA STASIUN KERJA 3 DIVISI FINAL ASSEMBLY LINE UNTUK PESAWAT NC-212I PT DIRGANTARA INDONESIA
title_full RANCANGAN PENUGASAN OPERATOR PADA STASIUN KERJA 3 DIVISI FINAL ASSEMBLY LINE UNTUK PESAWAT NC-212I PT DIRGANTARA INDONESIA
title_fullStr RANCANGAN PENUGASAN OPERATOR PADA STASIUN KERJA 3 DIVISI FINAL ASSEMBLY LINE UNTUK PESAWAT NC-212I PT DIRGANTARA INDONESIA
title_full_unstemmed RANCANGAN PENUGASAN OPERATOR PADA STASIUN KERJA 3 DIVISI FINAL ASSEMBLY LINE UNTUK PESAWAT NC-212I PT DIRGANTARA INDONESIA
title_sort rancangan penugasan operator pada stasiun kerja 3 divisi final assembly line untuk pesawat nc-212i pt dirgantara indonesia
url https://digilib.itb.ac.id/gdl/view/50235
_version_ 1822000604926443520