RANCANGAN PENUGASAN OPERATOR PADA STASIUN KERJA 3 DIVISI FINAL ASSEMBLY LINE UNTUK PESAWAT NC-212I PT DIRGANTARA INDONESIA
PT Dirgantara Indonesia (PT DI) is a state-owned enterprise (BUMN) engaged in the production of aircraft and helicopters. One product of PT DI is a NC-212i aircraft. The NC-212i has a demand of 6 units per year. PT DI was unable to fulfill the demand of the NC-212i due to the current production rate...
Saved in:
Main Author: | Hamid, Fyrlia |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/50235 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
RANCANGAN PENUGASAN OPERATOR PADA STASIUN KERJA 3 DIVISI FINAL ASSEMBLY LINE UNTUK PESAWAT NC-212I PT DIRGANTARA INDONESIA
by: Hamid, Fyrlia -
RANCANGAN PENUGASAN OPERATOR PESAWAT NC-212I PADA STASIUN KERJA 1 DIVISI FINAL ASSEMBLY LINE PT DIRGANTARA INDONESIA
by: Carin Anastasya, Maria -
PERANCANGAN PENUGASAN OPERASI DAN PEKERJA PADA STASIUN KERJA LINTAS PERAKITAN FINAL PESAWAT NC 212I PT DIRGANTARA INDONESIA
by: Alivia Yosefella, Sharene -
RANCANGAN PENUGASAN OPERATOR PADA AREA KERJA LINTAS PERAKITAN AKHIR PESAWAT NC212I DI PT. DIRGANTARA INDONESIA
by: Meylannie, Irene -
USULAN MODEL UNTUK PENENTUAN KEBUTUHAN OPERATOR DAN PENUGASAN OPERATOR PADA STASIUN KERJA 2 LINTAS PERAKITAN FINAL PESAWAT NC 212I PT DIRGANTARA INDONESIA
by: Fitri Nadifa, Amanda