CONSTRUCTION MANAGEMENT PLAN OF MIXED-USE BUILDING, THE TERRACE CIBADAK BANDUNG

The Terrace is an architectural design project which is yet to be realized. To start building the project, it needs a detailed planning such as technical drawing and construction management plan. The writer is motivated to design a construction management plan that consist of deciding construction m...

Full description

Saved in:
Bibliographic Details
Main Author: Luis Winata, Pierro
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/50278
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:50278
spelling id-itb.:502782020-09-23T11:48:19ZCONSTRUCTION MANAGEMENT PLAN OF MIXED-USE BUILDING, THE TERRACE CIBADAK BANDUNG Luis Winata, Pierro Indonesia Final Project Construction Method; Project Scheduling; Cost Estimation. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/50278 The Terrace is an architectural design project which is yet to be realized. To start building the project, it needs a detailed planning such as technical drawing and construction management plan. The writer is motivated to design a construction management plan that consist of deciding construction methods, scheduling, and estimating the detailed construction cost of this project. Hence, this writing could be used as reference when the project is decided to be built in the future. The first step to conduct this thesis is by collecting related information regarding the project. Then, it continues to determine work breakdown structure and construction methods. The construction methods are designed for preparation work, drainage system, substructure, dan superstructure. For superstructure, the works will be done in parallel for three separate zones, each in basement, podium, and tower. The next step is calculating volume of works through technical drawings. Then, it proceeds to determine the relationship between tasks and productivity of team resources, which consist of workers and equipment, to create a schedule for the project. The schedule is arranged by using “satu tim satu zona / one team for one work zone” concept and Microsoft Project 2013 software is introduced to help generating the schedule. According to the generated schedule, the project starts at 3rd of August 2020 and will end in 14th of August 2023(904 calendar days). This duration is chosen after 8th iterations on resources diagram in order to get relatively less fluctuating number of resources. Next, Detailed cost estimation of the projects is calculated through unit cost analysist, for standardized works, and resource enumeration, for non-standardized works. The estimated detailed cost of the project is Rp178.216.733.657 for total area of 31,216.5 m2 (Rp5,709,060/m2). The detailed cost estimation incorporates direct cost (85%) and indirect cost (15%). The direct cost is dominated by superstructure work (67.7%). The detailed cost estimation is higher than conceptual cost estimation by 14.58%. This deviation is caused by the difference in the function of the buildings and the substructure that is being used in The Terrace. The last step is modelling a S-curve of the project which has fulfilled the requirement of ideal S-curve. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The Terrace is an architectural design project which is yet to be realized. To start building the project, it needs a detailed planning such as technical drawing and construction management plan. The writer is motivated to design a construction management plan that consist of deciding construction methods, scheduling, and estimating the detailed construction cost of this project. Hence, this writing could be used as reference when the project is decided to be built in the future. The first step to conduct this thesis is by collecting related information regarding the project. Then, it continues to determine work breakdown structure and construction methods. The construction methods are designed for preparation work, drainage system, substructure, dan superstructure. For superstructure, the works will be done in parallel for three separate zones, each in basement, podium, and tower. The next step is calculating volume of works through technical drawings. Then, it proceeds to determine the relationship between tasks and productivity of team resources, which consist of workers and equipment, to create a schedule for the project. The schedule is arranged by using “satu tim satu zona / one team for one work zone” concept and Microsoft Project 2013 software is introduced to help generating the schedule. According to the generated schedule, the project starts at 3rd of August 2020 and will end in 14th of August 2023(904 calendar days). This duration is chosen after 8th iterations on resources diagram in order to get relatively less fluctuating number of resources. Next, Detailed cost estimation of the projects is calculated through unit cost analysist, for standardized works, and resource enumeration, for non-standardized works. The estimated detailed cost of the project is Rp178.216.733.657 for total area of 31,216.5 m2 (Rp5,709,060/m2). The detailed cost estimation incorporates direct cost (85%) and indirect cost (15%). The direct cost is dominated by superstructure work (67.7%). The detailed cost estimation is higher than conceptual cost estimation by 14.58%. This deviation is caused by the difference in the function of the buildings and the substructure that is being used in The Terrace. The last step is modelling a S-curve of the project which has fulfilled the requirement of ideal S-curve.
format Final Project
author Luis Winata, Pierro
spellingShingle Luis Winata, Pierro
CONSTRUCTION MANAGEMENT PLAN OF MIXED-USE BUILDING, THE TERRACE CIBADAK BANDUNG
author_facet Luis Winata, Pierro
author_sort Luis Winata, Pierro
title CONSTRUCTION MANAGEMENT PLAN OF MIXED-USE BUILDING, THE TERRACE CIBADAK BANDUNG
title_short CONSTRUCTION MANAGEMENT PLAN OF MIXED-USE BUILDING, THE TERRACE CIBADAK BANDUNG
title_full CONSTRUCTION MANAGEMENT PLAN OF MIXED-USE BUILDING, THE TERRACE CIBADAK BANDUNG
title_fullStr CONSTRUCTION MANAGEMENT PLAN OF MIXED-USE BUILDING, THE TERRACE CIBADAK BANDUNG
title_full_unstemmed CONSTRUCTION MANAGEMENT PLAN OF MIXED-USE BUILDING, THE TERRACE CIBADAK BANDUNG
title_sort construction management plan of mixed-use building, the terrace cibadak bandung