PENERAPAN KONSEP FUNGSI UTILITAS DALAM PERKIRAAN BESARAN KOMPENSASI PADA PROSES NEGOSIASI KONFLIK OWNER - KONTRAKTOR PADA PROYEK KONSTRUKSI
<b>Abstract</b> : <p align=\"justify\"> <br /> Construction projects are highly influenced by uncertainty factors occurred during construction phase. This situation may lead parties into dispute. Negotiation process was the most attractive alternative dispute resol...
Saved in:
Main Author: | Simangunsong, Albert |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/5033 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PENERAPAN SISTEM PENGENDALIAN BIAYA/SKEDUL TERINTEGRASI PADA PEMBINAAN PROYEK JALAN KABUPATEN (1BRD-KR3 )
by: Safarudin -
KAJIAN KONSEP DAN STRATEGI PENGELOLAAN JALAN NASIONAL DAN PROPINSI DALAM ERA OTONOMI DAERAH
by: Lusiana -
KAJIAN GEOMETRI SUNGAI TERHADAP KAPASITAS ANGKUTAN SEDIMEN DAN DEBIT ALIRAN (STUDI KASUS SUNGAI CITANDUY DI JAWA BARAT )
by: Wibowo, Hari -
#TITLE_ALTERNATIVE#
by: Hasan, Luthfi -
KINERJA CAMPURAN HOT ROLLED ASPHALT DENGAN VARIASI FILTER YANG DIPADATKAN DENGAN GYRATORY TESTING MACHIN
by: Jazir, Muhammad