INTERCHANGE AND INTERCONNECTION PLANNING OF CIKALONG TRANSMISSION PIPES FOR FULFILLMENT OF GEDEBAGE DRINKING WATER SUPPLY ZONE AND OPTIMIZATION OF FLOW CAPACITY TOWARDS BADAKSINGA WATER TREATMENT PLANT

PDAM Tirtawening is the only one of the local company which have responsibility for serving drinking water in Bandung City. Otherwhise, in reality water serving in Bandung City haven’t meet with the goals to give the service for the whole city because of the limitation of product water that doesn’t...

Full description

Saved in:
Bibliographic Details
Main Author: Fakhirah Amir Nur, Zalfa
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/50472
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:50472
spelling id-itb.:504722020-09-24T09:41:38ZINTERCHANGE AND INTERCONNECTION PLANNING OF CIKALONG TRANSMISSION PIPES FOR FULFILLMENT OF GEDEBAGE DRINKING WATER SUPPLY ZONE AND OPTIMIZATION OF FLOW CAPACITY TOWARDS BADAKSINGA WATER TREATMENT PLANT Fakhirah Amir Nur, Zalfa Indonesia Final Project Gedebage zone, increase drinking water supply, main distribution network, PDAM Tirtawening, planning interchange and interconnection. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/50472 PDAM Tirtawening is the only one of the local company which have responsibility for serving drinking water in Bandung City. Otherwhise, in reality water serving in Bandung City haven’t meet with the goals to give the service for the whole city because of the limitation of product water that doesn’t still balance with water demand. East Bandung Region is one of the service area of PDAM Tirtawening that have the lowest service, especially in Gedebage Zone. In the others hand, based on Bandung City Urban Planning 2011-2031 that included in Local Regulation Number 18 of 2011, East Bandung Region is the part of area that should be have increased in water supply facilities. So, PDAM Tirtawening had a planning to develop the service area in East Bandung Region, which also need to provide raw water supply. So, PDAM Tirtawening planning to build main distribution network by utilizing the Cikalong Water Treratment Plan with a processing discharge of 750 liters/second. This capacity is intended for Gedebage area which consists of three main districts, there are Gedebage District, Buahbatu District and Rancasari District. The service target to be achieved is 90% of services in the 10-year planning period starting in 2021-2030. With this program plan, the existing transmission piping will be optimized which will change its function and be used for Gedebage services as well as piping that will continue to provide standard air for Badaksinga Water Treatment Plant. In designing the interchange and interconnection of the transmission pipe, there are 3 alternatives for selecting the interchange location which are simulated using EPANET 2.0 software. Then the location selection was carried out using the SAW method and the selected exchange locations were at points OVS-3L and OVS-3B. In addition, it will plan a main distribution network with 9 blocks of total service area owhich will be simulated with EPANET 2.0 software. It is estimated that the investment cost in this design is Rp. 48,417,000,000.00. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PDAM Tirtawening is the only one of the local company which have responsibility for serving drinking water in Bandung City. Otherwhise, in reality water serving in Bandung City haven’t meet with the goals to give the service for the whole city because of the limitation of product water that doesn’t still balance with water demand. East Bandung Region is one of the service area of PDAM Tirtawening that have the lowest service, especially in Gedebage Zone. In the others hand, based on Bandung City Urban Planning 2011-2031 that included in Local Regulation Number 18 of 2011, East Bandung Region is the part of area that should be have increased in water supply facilities. So, PDAM Tirtawening had a planning to develop the service area in East Bandung Region, which also need to provide raw water supply. So, PDAM Tirtawening planning to build main distribution network by utilizing the Cikalong Water Treratment Plan with a processing discharge of 750 liters/second. This capacity is intended for Gedebage area which consists of three main districts, there are Gedebage District, Buahbatu District and Rancasari District. The service target to be achieved is 90% of services in the 10-year planning period starting in 2021-2030. With this program plan, the existing transmission piping will be optimized which will change its function and be used for Gedebage services as well as piping that will continue to provide standard air for Badaksinga Water Treatment Plant. In designing the interchange and interconnection of the transmission pipe, there are 3 alternatives for selecting the interchange location which are simulated using EPANET 2.0 software. Then the location selection was carried out using the SAW method and the selected exchange locations were at points OVS-3L and OVS-3B. In addition, it will plan a main distribution network with 9 blocks of total service area owhich will be simulated with EPANET 2.0 software. It is estimated that the investment cost in this design is Rp. 48,417,000,000.00.
format Final Project
author Fakhirah Amir Nur, Zalfa
spellingShingle Fakhirah Amir Nur, Zalfa
INTERCHANGE AND INTERCONNECTION PLANNING OF CIKALONG TRANSMISSION PIPES FOR FULFILLMENT OF GEDEBAGE DRINKING WATER SUPPLY ZONE AND OPTIMIZATION OF FLOW CAPACITY TOWARDS BADAKSINGA WATER TREATMENT PLANT
author_facet Fakhirah Amir Nur, Zalfa
author_sort Fakhirah Amir Nur, Zalfa
title INTERCHANGE AND INTERCONNECTION PLANNING OF CIKALONG TRANSMISSION PIPES FOR FULFILLMENT OF GEDEBAGE DRINKING WATER SUPPLY ZONE AND OPTIMIZATION OF FLOW CAPACITY TOWARDS BADAKSINGA WATER TREATMENT PLANT
title_short INTERCHANGE AND INTERCONNECTION PLANNING OF CIKALONG TRANSMISSION PIPES FOR FULFILLMENT OF GEDEBAGE DRINKING WATER SUPPLY ZONE AND OPTIMIZATION OF FLOW CAPACITY TOWARDS BADAKSINGA WATER TREATMENT PLANT
title_full INTERCHANGE AND INTERCONNECTION PLANNING OF CIKALONG TRANSMISSION PIPES FOR FULFILLMENT OF GEDEBAGE DRINKING WATER SUPPLY ZONE AND OPTIMIZATION OF FLOW CAPACITY TOWARDS BADAKSINGA WATER TREATMENT PLANT
title_fullStr INTERCHANGE AND INTERCONNECTION PLANNING OF CIKALONG TRANSMISSION PIPES FOR FULFILLMENT OF GEDEBAGE DRINKING WATER SUPPLY ZONE AND OPTIMIZATION OF FLOW CAPACITY TOWARDS BADAKSINGA WATER TREATMENT PLANT
title_full_unstemmed INTERCHANGE AND INTERCONNECTION PLANNING OF CIKALONG TRANSMISSION PIPES FOR FULFILLMENT OF GEDEBAGE DRINKING WATER SUPPLY ZONE AND OPTIMIZATION OF FLOW CAPACITY TOWARDS BADAKSINGA WATER TREATMENT PLANT
title_sort interchange and interconnection planning of cikalong transmission pipes for fulfillment of gedebage drinking water supply zone and optimization of flow capacity towards badaksinga water treatment plant
url https://digilib.itb.ac.id/gdl/view/50472
_version_ 1822272379241365504